Unless stated otherwise, all dimensions are given in mm.
• Tie Rods DW 15 up to a maximum of 90.00 kN and Tie Rods DW 20 up to a maxi-
mum of 150.00 kN.
• The lowest of the above values apply top panels built before 1995 (Panels built
before 1991 are equipped with a leverage edge at the vertical edge profile and
panels built before 1995 do not have reinforcement plates by the tie holes). Refer
• A mixture of DW 15 and DW 20 tie rods on one site is not permitted.
• Warranty can only be granted for original tying equipment delivered by Hün-
nebeck.
• Compliance of the deformation limits refers to the deflection resulting from the
concrete pressure. Unevenness of the panels is not considered.
23 Chronology
Changes since edition 2021-07
Change
Page
Date
PLATINUM Tie Rod G2 and adjustment clip updated
2021-10
Table PLATINUM 100 Bulkhead Clamp updated
2021-10
Form strips removed.
39
2022-01
MANTO G3 Lifting Pin added.
45, 207
2022-01
Содержание Huennebeck MANTO G3
Страница 1: ...MANTO Large frame panel formwork User guide...
Страница 9: ...9 Unless stated otherwise all dimensions are given in mm MANTO...
Страница 61: ...61 Unless stated otherwise all dimensions are given in mm MANTO MANTO G3 M MANTO G3 M...
Страница 219: ...219 Unless stated otherwise all dimensions are given in mm MANTO...