31 

3.4.2 Three-Module Flush Mounting 

Before You Start   

 

Figure 3-37 Gang Box 

Note 

The dimension of one-module gang box is: 338.8(W)×134(H)×56(D) mm.The dimensions above are 
for reference only. The actual size can be slightly different from the theoretical dimension.

  

  

Steps   

1. Cave the installation hole, and pull the cable out.The suggested dimension of installation hole is 

321.8(W)×108(H)×45.5(D) mm. The suggested length of cables left outside is 270 mm. 

Содержание SF-VIMOD-CAM-2

Страница 1: ...Door Station Installation Guide...

Страница 2: ...tes a hazardous situation which if not avoided will or could result in death or serious injury Caution Indicates a potentially hazardous situation which if not avoided could result in equipment damage...

Страница 3: ...ation 8 3 1 Configure Sub Module Address 8 3 2 One Module Installation 9 3 2 1 Surface Mounting 9 3 2 2 Flush Mounting 12 3 3 Two Module Installation 17 3 3 1 Two Module Surface Mounting 17 3 3 2 Two...

Страница 4: ...apter 1 Appearance Front and Side Panel Figure 1 1 Front and Side Panel Table 1 1 Appearance Description No Description 1 Microphone 2 Low Illumination IR Supplement Light 3 Built in Camera 4 Loudspea...

Страница 5: ...Door Station Installation Guide 2 Bottom Panel Figure 1 2 Bottom Panel Table 1 2 Appearance Description No Description 8 Network Interface 9 Module connecting Interface output 10 Terminals...

Страница 6: ...elay Output NC A2 NO1 Door Lock Relay Output NO A3 COM Common Interface A4 NC2 Door Lock Relay Output NC A5 NO2 Door Lock Relay Output NO A6 GND Grounding A7 12 VDC Power Supply Output A8 GND Groundin...

Страница 7: ...all the related equipment is power off during the installation Wire the devices with power supply cables as picture shown below Door station should be connected to CH6 of the video audio distributor w...

Страница 8: ...Figure 2 3 Door Lock Wiring Note Terminal NC1 COM is set as default for accessing magnetic lock electric bolt terminal NO2 COM is set as default for accessing electric strike Lock should be powered b...

Страница 9: ...Figure 2 4 Door Magnetic Wiring Note AIN1 and AIN2 are defaulted to connect door magnetic Door magnetic connected to AIN1 detects status of the lock that connected to NC1 NO1 Door magnetic connected...

Страница 10: ...tton Wiring Figure 2 5 Exit Button Wiring Note AIN3 and AIN4 are set as default for connecting exit button Exit button connected to AIN3 opens the lock connected to NC1 NO1 Exit button connected to AI...

Страница 11: ...b Module Address You need to set the sub module address via DIP before installation Steps 1 Remove the rubber cover on the sub module rear panel to expose the DIP switch Figure 3 1 DIP Switch 2 Set th...

Страница 12: ...Address Digit 1 Digit 2 Digit 3 Digit 4 1 ON OFF OFF OFF 2 OFF ON OFF OFF 3 ON ON OFF OFF 4 OFF OFF ON OFF 5 ON OFF ON OFF 6 OFF ON ON OFF 7 ON ON ON OFF 8 OFF OFF OFF ON 3 2 One Module Installation...

Страница 13: ...nsion Steps 1 Paste the installation Sticker 1 onto the wall Make sure the sticker is placed leveled via measuring with the gradienter 2 Chisel 4 holes with drill align to the screw holes on the stick...

Страница 14: ...ounting frame onto the wall with 4 expansion bolts Figure 3 4 Fix the Mounting Frame 5 Connect the cables to the corresponding interfaces of the main unit and insert it into the frame Figure 3 5 Inser...

Страница 15: ...Door Station Installation Guide 12 Figure 3 6 Fix the Cover 3 2 2 Flush Mounting Before You Start Figure 3 7 Front and Side View of the Gang Box...

Страница 16: ...56 D mm The dimensions above are for reference only The actual size can be slightly different from the theoretical dimension Steps 1 Cave the installation hole and pull the cable out Note The suggeste...

Страница 17: ...d pull out the cables through the cable entry Mark the screw holes position with a marker and take out the gang box Figure 3 10 Mark the Screw Holes 4 Chisel 4 holes with drill align to marks on the w...

Страница 18: ...with concrete Remove the 4 mounting ears with tool after concrete is dry Figure 3 12 Remove the Mounting Ears 7 Insert the mounting frame together with the locating plates into the hole and fix it wit...

Страница 19: ...Door Station Installation Guide 16 Figure 3 13 Insert the Main Unit 9 Use the hexagon wrench in the package fix the cover Figure 3 14 Fix the Cover...

Страница 20: ...The dimensions above are for reference only The actual size can be slightly different from the theoretical dimension Steps 1 Paste the installation Sticker 1 onto the wall Make sure the sticker is pl...

Страница 21: ...ert the expansion sleeves into the screw holes 4 Fix the mounting frame onto the wall with 4 expansion bolts Figure 3 17 Fix the Mounting Frame 5 Thread the module connecting line across the thread ho...

Страница 22: ...ule connecting line to the corresponding interfaces of the main unit then place the main unit into the upper grid 2 Connect the other end of the module connecting line to the input interface of the su...

Страница 23: ...gure 3 19 Line Connection Effect Picture 7 Insert the modules into the frame after wiring The main unit must be placed in the top grid Figure 3 20 Insert the Modules 8 Use the hexagon wrench in the pa...

Страница 24: ...Door Station Installation Guide 21 Figure 3 21 Fix the Cover 3 3 2 Two Module Flush Mounting Before You Start Figure 3 22 Gang Box...

Страница 25: ...ension of installation hole is 220 W 108 H 45 5 D mm The suggested length of cables left outside is 270 mm Figure 3 23 Drill the Installation Hole 2 Select a cable entry and remove the plastic sheet 3...

Страница 26: ...n the wall and insert the expansion sleeves into the screw holes The suggested size of hole is 6 diameter 45 depth mm 5 Fix the gang box with 4 expansion bolts Figure 3 25 Fix the Gang Box 6 Fill the...

Страница 27: ...e modules 1 Connect Cable 1 and one end of Cable 2 to the corresponding interfaces of the main unit then insert the main unit into the upper grid 2 Connect the other end of Cable 2 to the input interf...

Страница 28: ...ers to the cables pulled out from the wall that connected to the main unit Cable 2 refers to the module connecting line in the accessory package 8 Fix the cover with 2 socket head cap screws by using...

Страница 29: ...7 mm The dimensions above are for reference only The actual size can be slightly different from the theoretical dimension Steps 1 Paste the installation sticker 1 onto the wall Make sure the sticker...

Страница 30: ...llation Guide 27 Figure 3 30 Drill Screw Holes 3 Remove the sticker and insert the expansion sleeves into the screw holes 4 Fix the mounting frame onto the wall with 4 expansion bolts Figure 3 31 Fix...

Страница 31: ...or this step The tamper plate should be at the low right of the first grid Figure 3 32 Mounting Frame 5 Thread the module connecting line across the thread holes of the frame Pass the main unit connec...

Страница 32: ...ut interface of the sub module Connect two sub modules via module connecting line 2 3 Organize the cables with cable tie in the package The suggested cable connection picture as shown below Figure 3 3...

Страница 33: ...Door Station Installation Guide 30 Figure 3 36 Fix the Cover...

Страница 34: ...le gang box is 338 8 W 134 H 56 D mm The dimensions above are for reference only The actual size can be slightly different from the theoretical dimension Steps 1 Cave the installation hole and pull th...

Страница 35: ...s through the gang box hole 2 Insert the gang box into the installation hole 3 Mark the gang box screw holes position with a marker and take out the gang box Figure 3 39 Mark the Screw Holes 4 Drill 4...

Страница 36: ...insert the modules 1 Connect Cable 1 and one end of Cable 2 to the corresponding interfaces of the main unit then insert the main unit into the upper grid 2 Connect the other end of Cable 2 to the in...

Страница 37: ...le 1 refers to the cables pulled out from the wall that connected to the main unit Cable 2 and Cable 3 refer to the module connecting line in the accessory package 8 Fix the cover and the main unit wi...

Страница 38: ...2 7 mm The dimensions above are for reference only The actual size can be slightly different from the theoretical dimension Steps 1 Paste two Sticker 1 onto the wall Make sure the stickers are placed...

Страница 39: ...Screw Holes 4 Remove the stickers and insert the expansion sleeves into the screw holes 5 Thread the module connecting line 400 mm and grounding line across the thread hole of both frames Figure 3 46...

Страница 40: ...the package is for grounding 6 Fix the mounting frame onto the wall with 8 expansion bolts Figure 3 47 Fix the Mounting Frame 7 Pass the main unit connecting line across the thread hole to the top gri...

Страница 41: ...nect the other end of the module connecting line 1 to the input interface of the sub module Connect all sub modules via module connecting lines 3 Organize the cable with cable tie in the package The s...

Страница 42: ...Figure 3 50 Insert the Modules 10 Pull the grounding line out and fixed its two end to the screw on the cover Figure 3 51 Connect the Grounding Line to the Cover 11 Use the hexagon wrench in the packa...

Страница 43: ...Door Station Installation Guide 40 Figure 3 52 Fix the Cover...

Страница 44: ...Door Station Installation Guide 41 3 5 2 More Than Three Module Flush Mounting Before You Start Figure 3 53 Gang Box...

Страница 45: ...8 W 134 H 56 D mm The dimension is for reference only Steps 1 Drill the installation hole and pull the cable out The suggested dimension of installation hole is 321 8 W 315 H 45 5 D mm The suggested...

Страница 46: ...the plastic sheets on the side of the gang boxes shown as 1 and 2 below Figure 3 56 Remove the Plastic Sheets 5 Mark the gang box screw holes on the wall 1 Route the cables through the gang box hole...

Страница 47: ...expansion sleeves into the screw holes The suggested size of hole is 6 diameter 45 depth mm 7 Fix the gang boxes with 8 expansion bolts Figure 3 58 Fix the Gang Boxes 8 Fill the gap between the gang b...

Страница 48: ...2 to the corresponding interfaces of the Main Unit then place the Main Unit into the upper grid of the left gang box 2 Connect the other end of Cable 2 to the input interface of Sub Module 1 Connect o...

Страница 49: ...le shown as below Figure 3 61 Cables Connection Note Cable 2 3 5 and 6 are the module connecting lines 190 mm in the package Cable 4 is the module connecting line 400 mm in the package Main unit must...

Страница 50: ...Door Station Installation Guide 47 Figure 3 62 Connect the Grounding Line to the Cover 11 Fix the cover with 2 socket head cap screws by using a hexagon wrench supplied...

Страница 51: ...Door Station Installation Guide 48 Figure 3 63 Fix the Cover...

Страница 52: ...UD13576N...

Отзывы: