INSTALLATION: MOUNTING LOCATION

INSTALLATION: MOUNTING

Install the Safgard 250 in a 1" equalizing 

line equipped with a blow-down valve 

meeting applicable state and local codes. 

The control should be located so that the 

“LOW WATER CUT-OFF LEVEL” marked 

on the control casing is at least 1/2" 

above the lowest permissable water level 

as specified by the boiler manufacturer.

 Any model 250 should act as 

the primary Low Water Cut-Off ONLY. It 

should not be used as a secondary Low 

Water Cut-Off.

Model 250 diagram on page 5. Model 250WC diagram on page 6.

Mount the Low Water Cut-Off and Pump Controller

See Figure 1 below. Mount and pipe the Low Water Cut Off Manifold on a vertical equalizing pipe at the required 

elevation level determined in 

mounting location section above. Then, install a fully ported blow-down valve (and 

discharge line) directly below the lower cross of the water equalizing pipe.

 For best results, we recommend a dual valve blow-down system for the 250 Series Control.

Gauge Glass

Model 250WC is designed to have a gauge glass (not included) on the Low Water Cut Off Manifold (see diagram on 

page 6 for mounting location).

VERTICAL
EQUALIZING 
PIPE

250 LWCO

WATER
EQUALIZING 
PIPE

UPPER BLOW-DOWN
VALVE (recommended)

LOWER BLOW-DOWN
VALVE

250 LWCO

250WC LWCO

LOW WATER CUT-OFF 

LEVEL INDICATOR

LOW WATER CUT-OFF 

LEVEL INDICATOR

Gauge Glass and relevant mounting 

hardware not included (see Gauge 

Glass section under Mounting below)

Figure 1  Control mounting

Содержание 250

Страница 1: ...s with all other limit and operating controls installed on the boiler After installation check for proper operation of all of the limit and operating controls before leaving the site To prevent seriou...

Страница 2: ...the Low Water Cut Off Manifold on a vertical equalizing pipe at the required elevation level determined in mounting location section above Then install a fully ported blow down valve and discharge lin...

Страница 3: ...it and both the condensate pump and burner circuit Direct wiring of the control to either the burner circuit or condensate pump can result in failure of the control G H A LWCO ALARM RY2 N C 120VAC HO...

Страница 4: ...ICATIONS PROBE TEST PRESSURE 1000PSI 1 Safgard 250 Pump Controller LWCO combination 2 Safgard 270 High Water Limit Alarm 3 Safgard 550 or 750 as Secondary LWCO 4 45 715 Feed Valve Assembly 5 Safgard 7...

Страница 5: ...5 DIMENSIONS and CONTROL LAYOUT Model 250 LWCO MAXIMUM STEAM PRESSURE 250 PSI...

Страница 6: ...6 DIMENSIONS and CONTROL LAYOUT Model 250WC LWCO...

Страница 7: ...wn of the control is required for proper operation Blow Down Schedule To flush the sediment from the chamber the control must be blown down in accordance with the following schedule Daily if operating...

Страница 8: ...s made within such period we will at our option repair or replace such products or refund the purchase price paid to us by you for such products In no event shall Hydrolevel Company be liable for any...

Отзывы: