18
8.3
Cleaning
The X-Rail Rigid Anchor Line may be cleaned by the end user periodically to increase service
life. After cleaning, the product shall undergo the pre-use inspection.
Rails and System - Clean rail, joiners, brackets fixing and fasteners with a rag and warm
water to remove dirt and grit. A mild detergent may be used to remove grease or oils from
the product.
Shuttle - Clean Shuttle with a rag and warm water to remove dirt and grit. A mild detergent
may be used to remove grease or oils from the product.
⚠
Do not store this product when wet. Allow the product to dry and conduct a pre-use
inspection prior to return the item to service.
9
Inspection
9.1
Before and After Use
The X-Rail Rigid Anchor Line shall be inspected before and after each use by the user.
9.2
Competent Person
A competent person shall inspect the product at least every 12 months.
9.3
Procedure
9.3.1 Rail - inspect the rail for deformation, damage, dents or debris that may affect the
strength of the rail or impede the Shuttle.
9.3.2 Joiners, System stop - inspect all fasteners are present and tight. Inspect the aluminium
for chips, cracks, discolouration, damage to the protective coating, bending or warping.
9.3.3 Corners and Jogs - inspect for deformation, damage, dents or debris that may affect
the strength of the rail or impede the Shuttle. Inspect all the fasteners are present and tight.
9.3.4 Fixings - inspect all fixings are present and tight. Inspect Fixings are free of damage,
debris, cracks, and corrosion.
9.3.5 Shuttle - inspect the housing is free of cracks, damage or deformation. Inspect the
attachment point is free of cracks, damage or deformation. Ensure all screws are present and
not loose. Inspect all the wheels contact the rail and the shuttle moves smoothly over the rail.
Inspect the markings are present and legible.
9.3.6 Fasteners - inspect the fasteners for corrosion, deformation, damage or leaks. Inspect
the rivets (where applicable) are installed in the correct number and location. Inspect the
clamps (where applicable) are torqued correct and installed in the correct number and location
9.3.7 Roof - inspect the roof sheet and structure for corrosion, deformation, damage or leaks
that may affect the strength of the roof.
9.3.8 Label - inspect the system label is present and legible as per Figure 28.