
12
13
7. MAINTENANCE
7.1 Inspection & maintenance intervals
A complete inspection consists of periodic visual and functional
checks along with minor adjustments in order to ensure the function.
The daily inspection prevents the abnormal wear and prolongs the
life of all machine systems.
Inspection and maintenance will be performed at specified
intervals. Inspection and maintenance must be carried out by
trained personnel who are knowledgeable in terms of electrical and
mechanical functions.
7.2 Electrical fuses
The lift has 3 electrical fuses that are located inside the plastic
covers on the chassis:
• Main fuse - 30A (blade fuse)
• Partial fuse - 315mA, 250V (glass fuse 5x20 mm)
• Emergency battery fuse - 30A (blade fuse)
REQUIREMENT!
Before performing daily maintenance, learn how the lift works
and is operated.
VARNING!
Always secure the platform from moving when maintenance is
performed with the platform raised.
Содержание PushAround PA35
Страница 1: ...ORIGINAL INSTRUCTIONS PushAround PA35...
Страница 17: ...17 NOTES...
Страница 18: ...18 NOTES...
Страница 19: ...19 NOTES...