8.
Inspect the alignment of the “C” (access) panels during assembly. Verify that their removal and
replacement allow adequate space and positioning with the adjacent panels prior to attaching brackets
to the concrete.
9.
Place the Inner Roof Connection Bracket under the “D1-D2” 2x4 panel connection on the inside and
then fasten it into place (Fig. 2E) using Hex Head Screws. Note that the Inner Roof Connection Bracket
has a tab that will fasten to the “F” (support) post later.
10.
Complete the anchoring bracket and roof clip installations in the following steps on one side before
moving on to the other side of the enclosure. Fastening each anchoring bracket will require two (2)
Hex Head Screws installed first and then one (1) Anchor per bracket installed last. Fastening each roof
clip will require one (1) Hex Head Screw per clip.
11.
Attach Outside Corner Anchoring Brackets (small) at both “A-BS” (corner) assemblies on the first side
of the enclosure (Fig. 2A) oriented as shown in Fig. 2, and then fasten them to the concrete.
12.
Attach Inside Anchoring Brackets (large) to the “BS” (side) panel studs at the bottom, inside on the
first side of the enclosure (Fig. 2B) oriented as shown in Fig. 2, and then fasten them to the concrete.
13.
With the “F” (support) post aligned in the space between the “C” (access) panels allowing
approximately a 3/16” gap between panels, install an Inside Anchoring Bracket (Fig. 2B) at the bottom
of the “F” (support) post on the first side of the enclosure.
14.
Insert Inside Roof Clips into the “D#” (roof) panels at both “BS” (side) panel studs (Fig. 2C) along the
first side of the enclosure and then fasten them in place.
15.
Fasten the Inner Roof Connection Bracket tab to the “F” (support) post using Hex Head Screws.
16.
Repeat these anchoring bracket and roof clip steps on the other side. Note that all provided anchoring
brackets and roof clips must be installed for the enclosure to withstand strong winds.
17.
Install Roof Cover Plates on the “D1-D2” seams (Fig. 2D) using two (2) Hex Head Screws per plate.
18.
Provide a ground-fault interrupter device in all electrical circuits per all applicable codes. Install the
heater(s) as per the manufacturer’s instructions and governing local and national codes.
19.
For maximum protection, it is suggested that the area between the bottom of the enclosure and the
concrete base should be caulked except for the “C” panels. DO NOT CAULK THE BOTTOM OF
THE “C” PANELS.
20.
REMOVE THE PVC MASKING FILM IMMEDIATELY AFTER INSTALLATION. If the panels get
wet with the masking film in place, water will irreversibly stain the panels. Summertime heat will bake