
PRIME DESIGN, A SAFE FLEET BRAND
▪
Address: 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118
▪
Phone: 651-552-8554
▪
Toll Free: 1.8.PRIME.RACK
▪
Fax: 651-552-1799
▪
Email: [email protected]
▪
Website: www.primedesign.net
TM & © 2018 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6764268, 6971563, 2364879, 8857689, 8511525, 8991889, 2271515, 2364897, 9506292, 9481313, 9481314, 9796340, 6202807, 6427889, 9415726 AND OTHER PATENTS PENDING
11
18
13/20
12
14
15
19
17
16
21
21
Place the Quick Start Guide into
the vehicle’s glove box for ladder
setup and adjustment.
QUICK START GUIDE
LEFT ROTATION ASSEMBLY SEQUENCE
Repeat Steps 3.1
-
3.3 to
install the left side Drive Shaft.
12
13
Repeat Steps 4.1 and 4.2 to
attach the left Cylinder.
14
Repeat Steps 5.1 and 5.2 to install
the left side Connecting Bar.
Repeat Steps 6.1
-
6.4 to install
the left Front Drive Shaft.
15
16
Repeat Step 7 to install the left
side Connecting Bar fasteners.
Repeat Steps 8.1 and
8.2 to
seal the Drive Shafts.
17
Repeat Steps 9.1
-
9.9
to attach the L Posts.
18
21
Place the Rotation Quick Start
Guide into the vehicle’s glovebox.
20
Repeat Step 11 to adjust
the Hydraulic Cylinder.
19
Repeat Steps 10.1
-
10.4
to attach the Z Posts.
VRR-TC11B
ASSEMBL
Y INSTR
UCTIONSLEFT SIDE RO
TA
TION
Содержание PRIME DESIGN VRR-TC11B
Страница 1: ......
Страница 12: ...USAM VRRTC11B US01 Rev C 0718...