
PRIME DESIGN, A SAFE FLEET BRAND
▪
Address: 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118
▪
Phone: 651-552-8554
▪
Toll Free: 1.8.PRIME.RACK
▪
Fax: 651-552-1799
▪
Email: [email protected]
▪
Website: www.primedesign.net
TM & © 2019 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6764268, 6971563, 2364879, 8857689, 8511525, 8991889, 2271515, 2364897, 9506292, 9481313, 9481314, 9796340, 6202807, 6427889, 9415726 AND OTHER PATENTS PENDING
8
M8 Locknut
Flat Washer
M8 x 35MM
Carriage Bolt
View from vehicle front
USAM-VBCFT31B-US01 Rev-C 0419
VBC-FT31B ASSEMBL
Y
INSTR
UCTIONS
LADDER STOPS
8.2
Torque to 90 in-lbs
8.1
Loosen nuts
NOTE:
The orientation of
the bolt hole faces away
from the Crossbar
Place the Front Hook Clamp Bracket removed in Step 7.1
into the lower groove of the Crossbar, and slide it on top
of the Front Ladder Hook Clamp
7.3
7.4
Reassemble the Front Clamp Down Tube Holder
using the fastening hardware removed at Step
7.1. Do not tighten until Step 7.6
7.6
Torque to 90 in-lbs
7.5
Adjust the Front Hook until it aligns with the Rear Hook. Perfect
alignment may not be possible in all instances, and depends
upon the location of the Crossbar Mounting Brackets. If such
interference should occur, align the Hook as close as possible.
Содержание Prime Design VBC-FT31B
Страница 1: ......