PRIME DESIGN, A SAFE FLEET BRAND 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118 ▪ Phone: 651-552-8554 ▪ 1.8.PRIME.RACK ▪ Fax: 651-552-1799 ▪ Email:[email protected] ▪ www.primedesign.net
TM & © 2017 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6092974, 6764268, 6971563, 2364879, 8857689, 8511525, 8991889 AND OTHER PATENTS PENDING
5
3
3
1
2
3
4
5
6
7
8
9
1
2
1
2
3
4
5
6
7
8
9
CON-8005
ASSEMBL
Y INSTR
UCTIONS– GEN 1 CONDUIT CARRIER
GEN1 CONDUIT MOUNTING KIT
INSTALLATION SEQUENCE
NOTE: Ladder Rack and Conduit Carrier is
shown for illustrative purposes only, and is
not included with this Conduit Mounting Kit.
This Conduit Mounting Kit contains only the
parts needed to repair, replace, or add one
Conduit Carrier.
CROSSBAR PREPARATION-REAR
Find the center of the top of Rear Crossbar between the inner
bends. Using a grease pencil, mark the center, then measure
out 3.50” to the left and right of that center mark and mark
again using the grease pencil. The marked distances will
measure 7.00” across as shown below.
1.1
Prior to drilling, mark a center line along the length of the
Crossbar to ensure the holes are correctly centered.
1.2
Drill holes using a
3/8” steel drill bit.
1.3
NOTE: Not all Gen 1 Crossbars are factory drilled to
receive accessories. If not drilled, prerform Steps 1.1
to
2.3. If factory drilled, proceed to Step 3.1. Additionally,
not all Gen 1 racks will have enough space between
the Rotation Uppers to fit a Conduit Carrier. A minimum
of 7.00” is required between the Uppers, and on the
Crossbar’s top, so measure prior to drilling to ensure
there will be no Rotation interference.
Содержание Prime Design CON-8005
Страница 1: ......
Страница 11: ...Page Intentionally Left Blank ...
Страница 12: ...USAM CON8005 US01 Rev A 0917 ...