background image

Page Intentionally Left Blank

Содержание PRIME DESIGN AR1901

Страница 1: ......

Страница 2: ...F THE FOLLOWING PATENT NO s 6092974 6764268 6971563 2364879 8857689 8511525 8991889 AND OTHER PATENTS PENDING 2 6 1 5 3 4 End Caps 4X Screws 8X Channels 2X T Slot Insert 18X Square Nut 18X M8 Bolt 18X 2 AR1901 ASSEMBLY INSTRUCTIONS PACKAGING CONTENTS 1 Channels Qty 2 With hardware CONTENTS OVERVIEW 2 Mounting Bracket Assembly Qty 6 U Bracket 3 Side Rail Assembly Qty 1 Left Hand 115 00 4 Side Rail ...

Страница 3: ...OWING PATENT NO s 6092974 6764268 6971563 2364879 8857689 8511525 8991889 AND OTHER PATENTS PENDING 3 M8 Cap Head Bolt 14X M8 Lock Washer 14X M8 Cap Head Bolt 2X M8 Lock Washer 2X Roller Spring 2X Roller Tube Pin 2X Roller End Cap 2X Roller Holder 2X Roller Tube 63 75 1X M8 Strip Nut 2X AR1901 ASSEMBLY INSTRUCTIONS PACKAGING CONTENTS 5 AluRack Standard Crossbar Qty 7 With hardware 67 00 6 ARL 8 Qt...

Страница 4: ...ont Rear Front Left Right 18 00 Channel Front 12 00 Channel Rear Square Nut M8 Vehicle Roof Mount Channel Connector Bolt M8 x 20MM Left Rear Right Rear 33 75 1 5 16 56 00 33 75 1 5 16 56 00 AR1901 ASSEMBLY INSTRUCTIONS FBM MOUNTINGS AR1901 MOUNTING SYSTEM CHANNELS TO ROOF Do not tighten 0 5 Loosen bolts 0 6 Set to distances then torque Rear Bracket nuts to 90 in lbs leaving Center and Front Bracke...

Страница 5: ...net TM 2015 PRIME DESIGN PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO s 6092974 6764268 6971563 2364879 8857689 8511525 8991889 AND OTHER PATENTS PENDING 5 4 1 3 3 3 3 2 3 3 3 5 AR1901 ASSEMBLY INSTRUCTIONS CROSSBAR INSTALLATION ALURACK ASSEMBLY SEQUENCE LEFT SIDE RAIL AND CROSSBARS Crossbar Bolts attach into pre installed Strip Nuts 1 1 Do not tighten until Step 3 2 1 2 ...

Страница 6: ... THE FOLLOWING PATENT NO s 6092974 6764268 6971563 2364879 8857689 8511525 8991889 AND OTHER PATENTS PENDING 6 108 50 18 75 18 75 18 75 Front Rear 5 18 75 18 75 14 75 AR1901 ASSEMBLY INSTRUCTIONS CROSSBAR INSTALLATION RIGHT SIDE RAIL AND CROSSBARS 2 1 Do not tighten until Step 3 2 2 2 Crossbar Bolts attach into pre installed Strip Nuts CROSSBAR ADJUSTMENT 3 1 3 2 Torque Bolts to 90 in lbs Adjust C...

Страница 7: ...esign net www primedesign net TM 2015 PRIME DESIGN PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO s 6092974 6764268 6971563 2364879 8857689 8511525 8991889 AND OTHER PATENTS PENDING 7 AR1901 ASSEMBLY INSTRUCTIONS ROLLER ASSEMBLY INSTALLATION ROLLER ASSEMBLY 4 1 4 2 4 3 Position Roller Assembly flush to rear then torque Allen Head bolts to 90 in lbs ...

Страница 8: ...Y ONE OR MORE OF THE FOLLOWING PATENT NO s 6092974 6764268 6971563 2364879 8857689 8511525 8991889 AND OTHER PATENTS PENDING 8 AR1901 ASSEMBLY INSTRUCTIONS RACK TO CHANNELS INSTALLATION Even Left Rear Right Rear Even MOUNTING RACK TO CHANNELS 5 2 5 4 5 5 Torque to 90 in lbs 5 1 Loosen nuts on all Mounting Brackets 5 3 Position Rack until evenly spaced between Channel Mountings Channel Mountings al...

Страница 9: ...PATENTS PENDING 9 AR1901 ASSEMBLY INSTRUCTIONS RACK TO CHANNELS INSTALLATION ADDITIONAL INFORMATION For additional information regarding your AR1901 Ladder Rack please visit the Prime Design website at www primedesign net Using a QR code reader in your smart phone or tablet read the QR Code shown below and follow the same steps as you would from your laptop or computer If you re viewing this docum...

Страница 10: ...Page Intentionally Left Blank ...

Страница 11: ...Page Intentionally Left Blank ...

Страница 12: ...USAM AR1901 US01 Rev A 0215 ...

Отзывы: