1852-37: 4 of 4; Rev. 1; 05/03
Install the drawer: lift the back rollers on the Drawer
Rails over the front rollers on the Cabinet Rails, tilt
the drawer enough to start the drawer moving, and
lower the drawer to push it all the way into place.
With the special
AA
Drawer Screws, fasten one of
the Z Drawer Sides to the
BB
Drawer Back and the
DD
Inner Drawer Front, making sure all grooves face
the drawer center. Carefully slide the
CC
Drawer
Bottom into the grooves.
8
Now fasten the other Z Drawer Side, with four
AA
Drawer Screws.
9
Attach the
EE
Outer Drawer Front to the drawer by
inserting
FF
7/8” Washer Screws through the inner
Drawer Front and into the Outer Drawer Front (use
the OUTER set of holes). Next, attach the T Handle
to the drawer by inserting two
GG
1-1/2” Screws
through the inner Drawer Front, the Outer Drawer
Front and into the Handle (use the INNER set of
holes). Tighten securely. Attach the X Left Drawer
Rail and the Y Right Drawer Rail to the drawer
sides with the rollers toward the back, using three
G 1/2” Flat-head Screws each.
10
11
GROOVES
BB
DD
CC
HOLES
N O
HOLES
ROLLER
AA
Z
Z
AA
FF
GG
EE
G
Y
T
X
Insert two V Shelf Pegs into the small interior
holes on the left and right side panels, all on the
same level (See
inset
). Tilt the W Adjustable
Shelf and insert it between the doors. Position the
shelf onto the Shelf Pegs.
12
W
inset
V