Safavieh Lighting TBL4105 Скачать руководство пользователя страница 2

PREPARATION 

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware 

contents list.  If any part is missing or damaged, do not attempt to assemble the product.

Estimated Assembly Time: 6 minutes.

PLEASE USE ON/OFF TYPE"A" BULB MAX 40-WATT OR  CFL BULB MAX 13-WATT OR LED BULB MAX 9-WATT

THERE IS LED 4-WATT BULB IN THE BOX 

Step 1

Step 2

Put the socket(B) on the Lamp base(A) 

Put the light on a level surface to check

then put the Shade( C ) on the socket(B)

 if everything is stable.

Screw the Socket loop(D) onto the Socket(B)
Insert the bulb(E) into the socket(B).

ENJOY YOUR LAMP

Отзывы: