PREPARATION
* Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.
* If any part is missing or damaged, do not attempt to assemble the product.
* Estimated Assembly Time: 10 minutes.
Step 1:
Install the pipe1(B) into Lamp base(A) by clockwise, then
install the pipe2(C),pipe3(D) step by step. At Last, install the
Bend pipe(E) into pipe3(D) by clockwise.,Be careful not to twist
the power cord and tighten securely.
Step 2
:Put the shade(G) into the Socket(F), and lock with Ring(H).
Step 3
:Put the Light bulb(I) into the socket(F). Then if everything
is stable.
2/2