PREPARATION
*Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.
*If any part is missing or damaged, do not a�empt to assemble the product.
*Es�mated Assembly Time: 90 minutes.
*Tools Required for Assembly (included): Allen Key
*If you are having difficulty, our friendly Customer Care team is always here to help. Please email
STEP1
: Insert Cambolt (HW1) and Dowel Big (HW4) into Side Board Le�
(C) and Side Board Right (D). Insert Dowel Small (HW3),Center Boards 1
(F) and Center Board 2 (G) as figure.
STEP2
: Insert Cambolt (HW1) and Dowel Small (HW3) into Fixed Shelf (E)
and Bo�om Board (B). Insert Dowel Small (HW3) into Front Skirt 1 (I) and
Bo�om Skirt (J) as figure.
STEP3
: Insert Dowel Small (HW3) into Back Board 1 (N). A�ach An�
Deflec�on Bar (HW ST1430) into Front Skirt 2 (M) using Screw M6x35mm
(HW8) then �ghten using Allen Key (HW6)
as figure.
STEP4
: Insert
Screw M6.4x35mm (HW8) into Front Skirt 2 (M) into Top
Board (A) �ghten screws using Allen Key (HW6)
as figure. Insert Cambolt
(HW1) into Top Board (A).
1
4
3
3
1
4
G
F
C
D
1
3
E
3
N
8
6
ST1430
M
1
A
M
A
8
6
3
1
B
3
J
3
I