PREPARATION
*Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.
*If any part is missing or damaged, do not a�empt to assemble the product.
*Es�mated Assembly Time: 60 minutes.
*Tools Required for Assembly (included): Allen Key
*If you are having difficulty, our friendly Customer Care team is always here to help. Please email
1
2
24
F
F
x 2
x 2
HS26B
HS26B
19
19
H
I
STEP10
: Insert Center Leg (HW LM20A1) secure with
Screw M4.5x12.5mm (HW19) and �ghten it using screwdriver.
STEP9
: Install assembled leg unit from Step 8 onto main assembled
unit by inser�ng Screw (HW6). Tighten with Allen Key (HW8). Then
�ghten all the Screw M6.4x45mm each corner brace of the assembled leg.
STEP11
: A�er bringing the product upright, insert Shelf Pin (HW24)
into the holes on Sideboard & Center board, on the desired level.
Then place the Adjustable Shelf (F) to sit on the shelf pins, the shelf needs
to be �lted like the image when being put into the cabinet.
STEP12
: Insert Hinge (HW HS26B) into Door Le� (H) and Door Right (I).
Secure with Screw M4.5x12.5mm (HW19).
2
8
6
LM20A1
19