background image

PREPARATION

PM1

1

A

A

A�en�on to

the assembly posi�on

A�en�on to

the assembly posi�on

D

D

C

D

B

 ± 2-3mm

2

1

B

STEP1

: Install Moun�ng Plate (PM1) and secure with Screw M4.5x12.5mm 

(HW1) on Top Board.

STEP3

: Install Plate Shelf (HW2) and secure with Screw M4.5x12.5mm 

(HW1) on Fixed Shelf (B) posi�on as shown in the figure. Do not over�ght 

screw yet, leave around 2-3mm gap.

STEP4

: Insert Fixed Shelf (B) on Leg 1 posi�on as shown in the figure.

STEP2

: Carefully see the wooden leg type needed in this step. Insert 

Leg 2 (D) into Moun�ng Plate, �ghten by rota�ng the leg clockwise

.

*Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.

*If any part is missing or damaged, do not a�empt to assemble the product.

*Es�mated Assembly Time: 45 minutes.

*Tools Required for Assembly (included): Allen Key

*If you are having difficulty, our friendly Customer Care team is always here to help. Please email 

[email protected]

25

10

Отзывы: