PREPARATION
*Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.
*If any part is missing or damaged, do not a�empt to assemble the product.
*Es�mated Assembly Time: 60 minutes.
*Tools Required for Assembly (included): Allen Key
*If you are having difficulty, our friendly Customer Care team is always here to help. Please email
13
I
4
8
7
B
11
16
STEP5
: Combine components from step 4 with remaining Bo�om skirt 1
(I), using Screw M4x16mm (HW13). Do not over�ght screw yet, leave
around 2mm gap.
STEP6
: Insert Dowel Big (HW4) into assembled Bo�om skirt from
previous step.
STEP7
: Insert Screw M6.4x53mm (HW8) using Allen Key (HW7) into
assembled bo�om skirt and bo�om board.
STEP8
: First, let’s fixing the leg by inser�ng leg to Corner Brace, Insert
Flange Nut (HW16) first into the hanger bolt of leg, �ghten all the Flange nut
using provided Wrench (HW11). Second, a�er Ensuring that all legs
has been �ghtened, con�nue with �ghten all screws on the corner brace.
±2 mm
LT25B1
LT25B1