Step 1
Step 2
Step 3
Step 4
Preparation
Carefully place theTop glass( E) .
Assemble the Leg(B) Top shelf(A) together
using 4 screws(D).
Stick the Felt pad (C) on the bottom as show
in picture.
Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list.
If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 10 minutes.
Tools Required for Assembly (included):Assembly Fininal
Assemble the Leg( B-1 ) to Top shelf (A) using 4 screws(D).