background image

Step 1

Step 2

Step 3

Step 4

Preparation

 Carefully place theTop glass( E) .

Assemble the  Leg(B) Top shelf(A)   together 
using 4 screws(D).   

 Stick the Felt pad (C) on the bottom  as show 
in  picture.

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list. 
If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 10 minutes.
Tools Required for Assembly (included):Assembly Fininal

 Assemble the Leg( B-1 )  to  Top shelf (A)  using 4 screws(D).   

Отзывы: