PREPARATION
*Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.
*If any part is missing or damaged, do not a�empt to assemble the product.
*Es�mated Assembly Time: 60 minutes.
*Tools Required for Assembly (included): Allen Key
*If you are having difficulty, our friendly Customer Care team is always here to help. Please email
LT22A1
LT22A1
2
16
A
J
Laminated
7
G
Laminated
8
9
10
10
8
9
H
I
STEP5
: Install Leg (LT22A1) into Moun�ng Plate, �ghten by rota�ng the
leg clockwise
.
STEP6
: Slide in the Back Board (J) with laminated surface facing font.
A�ach Top Board (A) and Insert Camlock (HW2) then �ghten using
screwdriver. Put Screw Cap (HW6&16) over the camlock.
STEP7
: Insert Shelf Pin (HW7) into the provided holes on both Center
Boards at the desired level. Then place the Adjustable Shelf (G) onto the
Shelf Pin with laminated edge facing front.
STEP8
: Insert Sliding Top (HW9) and Sliding Bo�om (HW10) using Screw
M3.5x13mm (HW8) into Door Le� (H) and Door Right (I). Tighten with
a screwdriver.
6