Arrange center slat (C) so that t-nuts are facing the floor.
Slide allen bolt (H) from top of center slat (C) into the 2nd,
4th, 7th, and 9th predrilled holes.
Attach support leg (D) to center slat (C) using allen key (J)
to lock with allen bolt (H).
2
4
3
Step 2
Step 3
Step 4
T-NUT
J
H
C
D
D
D
D
C
K
C
H
J
D
C
X4
Attach slat roll (K) to the center slat (C), using
allen key (J) to lock with allen bolt (H).
Use 1st, 2nd, 5th, 8th, 11th, 12th pre-drilled holes
on slat roll (K).
Attach slat roll (K) on the bed frame, using
phillips head screwdriver to lock with wood screw (I).
Use pilot holes on siderails (B) as reference for
correct placement.
I
K
B
J
H
C
K
X6
X8