background image

The legs and hardware are located under the drawer

STEP2

 PUT THE WASHERS (H2) ON THE ALLEN 

BOLT (H1) IN THE ORDER SHOWN IN THE 
PICTURE

STEP3

 INSERT ALLEN BOLT WITH WASHER INTO 

THE BOTTOM PANEL HOLE AS SHOWN AND 
TIGHTEN WITH ALLEN KEY(H3).                                                                                                 

STEP 4

 PLACE THE MARBLE (C) GENTLY AS 

SHOWN.

STEP1

 OPEN THE ZIPPER ON THE INSIDE OF THE 

DRAWER AND TAKE OUT LEGS AND HARDWARE

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and 
hardware contents list. 
If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 15minutes.
Tools Required for Assembly (included): Allen Key

PREPARATION

H
3

A

H
1

H
2

B

C

Отзывы: