The legs and hardware are located under the drawer
STEP2
PUT THE WASHERS (H2) ON THE ALLEN
BOLT (H1) IN THE ORDER SHOWN IN THE
PICTURE
STEP3
INSERT ALLEN BOLT WITH WASHER INTO
THE BOTTOM PANEL HOLE AS SHOWN AND
TIGHTEN WITH ALLEN KEY(H3).
STEP 4
PLACE THE MARBLE (C) GENTLY AS
SHOWN.
STEP1
OPEN THE ZIPPER ON THE INSIDE OF THE
DRAWER AND TAKE OUT LEGS AND HARDWARE
Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and
hardware contents list.
If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 15minutes.
Tools Required for Assembly (included): Allen Key
PREPARATION
H
3
A
H
1
H
2
B
C
Содержание SFV5704A
Страница 3: ......