background image

STEP4

CONNECT THE MIDDLE ROD WITH 

SIDE LEGS SHOWN IN THE PICTURE.

PREPARATION

 

 

 

 

 

 

 

 

 

 

STEP3

 INSERT THE LEGS AND 

SCREW

 IN THE 

SCREW

S

 

BUT DON'T TIGHTEN COMPLETELY.REPEAT 

THE SAME STEPS FOR THE

 

OTHER THREE LEGS

 

 

 

 

 

 

PREARATION

A

 

 

 

 

 

 

 

 

 

HW2 HW1  HW4/HW

5

 

STEP5

 PUT THE OTTOMAN UPRIGHT AND MAKE SURE 

ALL

 

LEGS ARE LEVEL, THEN FIRMLY TIGHTEN BOLTS 

WITH

 

ALLEN KEY WHILE THE OTTOMAN IS UPRIGHT AS

PICTURED ABOVE.

 

 

 

 

 

 

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list.
If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 10 minutes.
Tools Required for Assembly (included):

Allen key

B

HW

6

STEP1 THE LEGS ARE PACKED TOGETHER WITH 
HARDWARE,OPEN TO TAKE THE LEGS AND 
HARDWARE.

STEP2

 PUT THE WASHERS ON THE

SCREW

 IN 

THE ORDER SHOWN IN THE PICTURE

HW3

 

HW2

 

HW

5

HW2

 

HW1

 

HW

4

HW

6

The legs and hardware are located

inside the carton

.

 

B

B

C

B

C

Отзывы: