3.3 Transmitter Input Power
3.3.1 Maximum Input Current Requirements
The maximum continuous AC and DC current requirements are tabulated in Table 3-1
and Table 3-2. The main AC and DC power breakers selected should be rated
accordingly and, in the case of the AC breaker, incorporate appropriate delay.
3.3.1.1 Single Transmitter
The maximum current is based on a single transmitter running at 125% maximum
power and 100% continuous modulation. Fault protection circuitry will shutdown the
system if these are exceeded.
Table 3-1 Single Transmitter MAX Input Current Requirements (Amps)
3.3.1.2 Dual Transmitter
The maximum current is based on both transmitters running simultaneously at 125%
maximum power and 100% continuous modulation. Fault protection circuitry will
shutdown the system if these are exceeded.
Table 3-2 Dual Transmitter MAX Input Current Requirements (Amps)
Danger:
Shock Hazard. Serious injury or death
from electrical
shock is possible when handling electrical power input wiring. Ensure AC
and DC main breakers are open. Observe any applicable standards
regarding Logout/Tagout (LOTO) procedures.
SYSTEM
100-264 VAC
BATTERY (38-52VDC)
SE125
3.2
7.6
SYSTEM
100-264 VAC
BATTERY (38-52VDC)
SE125
6.0
14.8
DC backup not intended for
test mode operation
Содержание SE SERIES
Страница 18: ...SOUTHERN AVIONICS COMPANY SE Series Transmitter 4 Table of Contents This page intentionally left blank ...
Страница 26: ...SOUTHERN AVIONICS COMPANY SE Series Installation and Setup 1 6 This page intentionally left blank ...
Страница 64: ...SOUTHERN AVIONICS COMPANY SE Series Installation and Setup 3 14 This page intentionally left blank ...
Страница 114: ...SOUTHERN AVIONICS COMPANY SE Series Installation and Setup 7 16 Operational Checks This page intentionally left blank ...
Страница 120: ...SOUTHERN AVIONICS COMPANY SE Series Transmitter 8 6 Maintenance This page intentionally left blank ...
Страница 136: ...SOUTHERN AVIONICS COMPANY SD Series Installation and Setup 9 16 Coupler Setup This page intentionally left blank ...
Страница 143: ...SOUTHERN AVIONICS COMPANY SD Series Installation and Setup 11 3 Closing Up The System ...
Страница 149: ...SOUTHERN AVIONICS COMPANY SE Series Installation and Setup 12 6 Optional Equipment This page intentionally left blank ...