
7
STEP 6 - Dustbox and Striker Plate Installation
27
47
28
22.5
27
61
2
2.5
16
Position striker Plate so latch bolt lock bar is
depressed when latch is engaged in Strike Plate
STEP 5 - Battery and Cover Installation
Internal Lever - Install Batteries
Internal Lever - Installation
• Insert batteries with positive and negative
poles as marked on the battery casing
• Loop internal lever cover over lever handle and press into
internal lever
Содержание DL700
Страница 12: ......