![SAB Heli Division Goblin 570 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/sab-heli-division/goblin-570/goblin-570_user-manual_794575025.webp)
0.75 mm
H0287
90°
Socket Head
Cap M2.5x6
(HC018-S)
Boom Bolt
Safety lock
(H0287-S)
H0395-S
HC164-S
Metrix Nylon
Screw M8x14mm
(HC164-S)
Plastic Wrench Nut M8
(HA016-S)
Installation Of The Boom
- Insert the boom in place helping enlarging the frame ( Fig 1,2 ).
- Push the boom forward until the nylon bolts bottom out against the end of the slot on the boom.
- Tighten the nylon bolts and only after tighten the two M3x10mm screws.
- For additional safety, install the boom bolt safety lock (Fig 3)
Tail Belt Tension
- Make sure the boom is assembled and installed correctly.
- Loosen up the tail case by loosening the 4 M3 screws.
- Mount the tail belt on the front pulley making sure the direction of rotation is correct (Fig 4).
- Adjust the belt tension by pulling on the tail case.
- Tighten the 4 M3 screws.
- Check that the tail output shaft is perpendicular to the boom (Fig 5).
- Connect the tail push rod to the tail servo.
- Make sure the tail belt and carbon rod are free, check the belt to ensure it is not twisted.
NOTE:
To remove the tail boom from the helicopter, it is possible to remove the front tail pulley
H0304-S without having to loosen up the tail case. Simply remove the locking screw and pull.
Note:
Between the boom and the aluminum
plate, there is a space of around 0.75mm.
Look the picture.
Socket Head Cap
Screw M3x10mm
(HC056-S)
Washer
3.1x 12x1.8mm
(H0078-S)
Copyright @ 2014 - SAB Heli Division - All rights reserved
Page 23
Chapter 13, Boom Assembly
Содержание Goblin 570
Страница 1: ......
Страница 13: ...6 Main Rotor Copyright 2014 SAB Heli Division All rights reserved Page 11 Chapter 6 Main Rotor Assembly ...
Страница 39: ...SAB HELIDIVISION GOBLIN 570 ...
Страница 40: ......