S/C Yachts Yachts SC 420 Скачать руководство пользователя страница 2

Boom 

One boom is supplied as shown below, all gear should be on or in the boom. Set the vang slide to 625mm to the 
centre of the slide from the back of the mast track. Set the front main sheet slide to 1385mm to the centre of the slide 
from the back of the mast track, also have the second mainsheet slide set just behind the first one at the 1385mm 
point. 

 

Pole 

One pole is supplied with the ends facing up. From the rope bag tie the pole rope on as the picture below shows, so 
the rope hangs below the pole when being used. 

 

 

Bow Attachments 

Have the bow attachments, shackled as shown. Then tie on the false forestay elastic and the jib tack rope, then tie the 
jib tack down as required. 

 

Forestay Spinner and Jib Head 

Shackle onto the forestay spinner and then use the rope for the jib head tie, to get the optimal position for your jib 
every time you go sailing. You can use the long shackle or the short shackle, plus also use the supplied tie if required. 
The position of the jib head should be approx 20mm from the bottom surface of the spinner. Below is a picture using 
the long shackle (which we recommend with no tie). 

Содержание Yachts SC 420

Страница 1: ...before attaching the shroud to the spreader end You will also need to feed the ropes into the mast via the mouse line supplied the best way to do this is to tape the two ropes together securely prior...

Страница 2: ...re below shows so the rope hangs below the pole when being used Bow Attachments Have the bow attachments shackled as shown Then tie on the false forestay elastic and the jib tack rope then tie the jib...

Страница 3: ...s is the 5 th pin hole position Mark the spreaders every two cm s from the centre of the shroud wire this can be used for the jib trim with regard to the leech settings Trapeze System The trapeze rope...

Страница 4: ...assemble them as required Fitting Bag In the fitting bag are all the fittings that are not fixed on the yacht or loose with a system that must be put on after you receive the boat We have also provid...

Страница 5: ...picture to get a good understanding of the mast end of the vang system Spinnaker Sheets and Spinnaker Knots The spinnaker sheet rope is a special type of 6mm rope This enables you to use it in a 6mm f...

Страница 6: ...ng guide as 1 chocks these can be used to chock the mast and lock it into place fore and aft whilst sailing This clearly has a big advantage on other systems and as the mast can be chocked forward in...

Страница 7: ...washers on the inside of the bolt to prevent water coming into the hull from the case whilst sailing Sponge and Bailer A sponge and bailer is provided as shown in the picture below this can be useful...

Страница 8: ...g snap hook onto the top of the vang system which connects onto the boom Another one should be used for the main halyard and the last one is to connect the rig tension strop to the Harken triple block...

Страница 9: ...o wing nuts on each side and also a plastic pin for locking the rudder down The bolt goes in the top locating hole and the plastic pin goes in the lower hole Covers The boat comes with a bottom cover...

Страница 10: ...cture For sail tuning information see tuning guide Tuning See tuning guide We hope this Instruction Manual was helpful to assemble and put together your S C 420 Yacht We also trust you will be very sa...

Отзывы: