background image

Jumbo Sand Box

 

Rutland County Garden Furniture Ltd, Ashbourne House, 2 Dovecote Meadows, 

Aslackby, Sleaford, Lincs, NG34 0HZ. 

Company No: 7670072   VAT No: 151744027 

  

3

 

 

Step 5 

 

Step 6 

 

 

 

...and secure in place with 4 coach screws. 

 

Add the final (short panel) using 4 more coach screws 
before moving on to the lid assembly. 

Step 7 

 

Step 8 

 

 

 

For each lid you will need one of the Lid panels, a 
Cross brace and two of the End frames.  

 

Lay the lid panel upside down as shown. 

 

 

 

Содержание Jumbo Sand Box

Страница 1: ...ce you can find our contact details on the final page of these instructions We highly recommend that any assembly is carried out on a flat level surface if possible and that you use another person to assist you if necessary Package contents Tools required 2 x Long box sides 2 x Short box sides 2 x Lid panels 4 x End frames 2 x Cross brace 24 x M8 Coach screws 8 x 65mm screws 10mm socket or spanner...

Страница 2: ... that you have all of the correct parts as listed on the front page of these instructions including any fixings Start construction by taking the four box sides and arranging one long and one short one as shown Step 3 Step 4 before securing the corner with 4 coach screws through the long panel into the edge of the short panel Add the second long panel to the other side as shown ...

Страница 3: ...ompany No 7670072 VAT No 151744027 3 Step 5 Step 6 and secure in place with 4 coach screws Add the final short panel using 4 more coach screws before moving on to the lid assembly Step 7 Step 8 For each lid you will need one of the Lid panels a Cross brace and two of the End frames Lay the lid panel upside down as shown ...

Страница 4: ...027 4 Step 9 Step 10 Position one of the End frames as shown so that the protruding cross piece is positioned at the outer edge of the panel and the squared end is toward the inner edge Step 11 Step 12 Working from within the Lid panel attach the End frame using 4 coach screws and a 65mm screw through the end of the Lid frame edging into the End frame ...

Страница 5: ...eat steps 8 to 14 and assemble the other Lid Place the box in your chosen location and line the bottom with a woven or perforated membrane Fill with good quality play sand then place the covers over the box as shown When not in use simply slide the covers over the box to keep your sand clean and dry We hope that you found your product quick and easy to assemble but if not and you require any furth...

Отзывы: