Rutland County Garden Furniture 7670072 Скачать руководство пользователя страница 9

Rutland Premium Pergola

 

Rutland County Garden Furniture Ltd, Ashbourne House, 2 Dovecote Meadows, 

Aslackby, Sleaford, Lincs, NG34 0HZ. 

Company No: 7670072   VAT No: 151744027 

 

 

Step 21 

 

Step 22 

  

 

 

 

 

Check everything looks square and fully slotted in place 
before securing the outer rafter with a 200mm coachscrew 
driven down through the rafter and runner into the post at 
each end.

 

 

Secure the intermediate rafter with a 120mm coachscrew 
driven down through the rafter into runner at each end. 

Step 23 

 

Step 24 

 

 

 

Manoeuvre a partial “goalpost” assembly from Step 17

 into 

place so that the runner end fully locates in the centre post 

slot….

 

 

...and secure in place with 2 of the 65mm woodscrews.

 

 

 

Содержание 7670072

Страница 1: ...details on the final page of these instructions We strongly recommend that any assembly is carried out on an open flat level surface if possible and with sufficient space You will also require the assistance of at least 2 adults to complete assembly safely If for any reason you don t feel confident in completing this project we would recommend consulting a qualified professional to undertake the w...

Страница 2: ...s Runners One piece Sculpted ends Runners Split One square end Rafters Double Slotted Posts Single Slotted Posts 6 post versions only Braces Cladding The assembly steps that follow are divided into 2 sections The first section Page 3 covers the assembly of a one piece runner pergola the second section Page 6 a split runner post pergola 6 post pergolas 4 2 and 4 8M in length are one piece runner Al...

Страница 3: ... aligned and square to the runner before securing into place with a 65mm woodscrew Repeat this process for the other end of the runner Step 3 Step 4 Add the braces butting their angled faces against the post and underside of the runner and aligning it centrally against the post before fixing into place with a 100mm coachscrew through each end Now arrange the 2 goalpost structures you have built so...

Страница 4: ...t your assistants to carefully raise both of the goalposts into the vertical as shown Drop the 2 outer rafters into place making sure they are slotted fully into the posts Step 7 Step 8 Check everything looks square and fully slotted in place before securing with a 200mm coachscrew driven down through the rafter and runner into each post Drop the remaining rafters into their slots ...

Страница 5: ... Step 9 Step 10 and secure with a 120mm coachscrew at each end Add the remaining braces to the corner posts fixing them as before with a 100mm coachscrew at each end Step 11 Step 12 If you have a 6 post version add the extra posts by sliding them into position as shown centred between the 2 central rafters before fixing to the runner with a pair of 65mm woodscrews ...

Страница 6: ... Sleaford Lincs NG34 0HZ Company No 7670072 VAT No 151744027 6 Step 13 Step 14 To attach cladding panels simply align as shown at the base of the post before screwing into place using 4 x 65mm woodscrews through the pre drilled holes per panel Repeat for each face of the post Your pergola is now complete ...

Страница 7: ...le slotted post is correctly aligned and square to the runner before securing into place with a 65mm woodscrew Step 17 Step 18 Align the Single slotted post at the other end of the runner as shown so that the end of the runner fills half of the slot and the post is perpendicular to the runner Fix in place with a pair of 65mm woodscrews Add the braces butting their angled faces against the post and...

Страница 8: ...lined in Steps 15 18 Arrange the 2 complete goalpost structures first assembled in steps 15 18 so that they are in or as close to their final location as a mirror pair with the bottoms of the posts facing each other and spaced around the same distance apart as the slots in the rafters see image above Step 19 Step 20 Get your assistants to carefully raise both of the goalposts into the vertical as ...

Страница 9: ...in place before securing the outer rafter with a 200mm coachscrew driven down through the rafter and runner into the post at each end Secure the intermediate rafter with a 120mm coachscrew driven down through the rafter into runner at each end Step 23 Step 24 Manoeuvre a partial goalpost assembly from Step 17 into place so that the runner end fully locates in the centre post slot and secure in pla...

Страница 10: ...t into place with the remaining 2 x 200mm coachscrews as you did in Step 21 Drop the remaining rafters into their slots and secure with a 120mm coachscrew at each end Step 25 Step 26 Add the remaining braces to the corner posts and centre post fixing them as before with a 100mm coachscrew at each end To attach cladding panels simply align as shown at the base of the post before screwing into place...

Страница 11: ... No 7670072 VAT No 151744027 11 Step 27 Your pergola is now complete We hope that you found your product quick and easy to assemble but if not and you require any further assistance or have any questions you can contact us by telephone on 01778 440803 Email info rutlandcountygardenfurniture co uk www rutlandcountygardenfurniture co uk ...

Отзывы: