RUTHMAN GUSHER PUMPS 7600 H Series Скачать руководство пользователя страница 6

7

When an ejector is used for priming it must be mounted 
at the highest point in the impeller housing to ensure re-
moval of all the air in the casing and suction pipe. Oper-
ate the ejector with the gate valve in the discharge line 
closed.  Operate  until  ejector  discharges  a  full  steady 
flow of liquid. On pumps using packing it may be neces-
sary to tighten packing gland (#9) to prevent pulling of air 
through shaft clearances. After pump is primed properly 
loosen gland to achieve a slight trickle of water through 
the stuffing box.

 

The vacuum pump must be mounted at the highest point 
in  the  impeller  housing  to  ensure  complete  removal  of 
entrained air. Gate valve in discharge line must be closed. 
After pump is primed valves between vacuum pump and 
Gusher pump must be closed. On pumps using packing 
it may be necessary to tighten packing gland (#9) to pre-
vent pulling of air through shaft clearances. After pump is 
primed properly loosen gland to achieve a slight trickle of 
water through the stuffing box.

 

INITIAL STARTING

 

For initial starting of the pump, the gate valve in the dis-
charge  line  should  be  closed  and  gradually  opened  as 
the motor reaches full speed (approximately 5 to 10 sec-
onds). After pump has been in operation and the suction 
and discharge lines are filled with liquid, it is not neces-
sary to close the gate valve when starting. 

PACKED PUMPS

 

At initial start-up loosen packing gland screws to allow 
free leakage. Then tighten screws uniformly on packing 
gland (#9) until leakage is reduced to approximately 30 
drops per minute. Never tighten packing enough to stop 
all leakage, a slight leakage is required to lubricate pack-
ing (#28) and prevent scoring of shaft sleeve (#20). Gusher 
uses non-asbestos packing which is a good general pur-
pose packing, good for hot or cold water, brine, oils, mild 
caustics, solvents, acids and many general chemicals. It 
is suitable for medium to high pressure applications. 

PUMPS WITH MECHANICAL SEALS

 

In applications where leakage from the stuffing box is not 
permissible  or  is  undesirable,  Gusher  pumps  are  avail-
able in a wide variety of mechanical seals to meet most 
any application. Gusher uses a John Crane Type 21 seal 
as standard. 

MAINTENANCE 

1. Lubrication - All pumps are lubricated at the Gusher 
Plant  and  should  not  require  additional  lubrication  for 
approximately  1200  hours  of  operation.  A  well  planned 
maintenance schedule can only be devised after the first 

six  months  of  operation  and  the  lubrication  record  re-
view at that time. Each pump installation is unique and 
requires individual attention to set up the proper lubrica-
tion schedule for each specific installation. About once a 
year it is recommended that the bearings be cleaned and 
flushed with kerosene or carbon tetrachloride and then 
relubricated.

 

NOTE:   Grease  lubrication  is  available  on  51H  &  52H 

Power Frames only. Oil bath lubrication is avail-
able  on  7071S,  7071M  and  7071L  as  a  stan-
dard and as an option on 51H and 52H Power 
Frames.

 

2. 

Coupling Alignment

 - Must be checked before and 

after system start-up, after 300 hours of operation, and 
again  after  1200  hours  of  operation.  Follow  procedure 
given  in  installation  instruction.  Again  we  strongly  rec-
ommend setting-up and following a routine preventative 
maintenance program to assure optimum life from your 
pump. 

3.

  Packed  Stuffing  Box

  -  DO  NOT  STOP  LEAKAGE! 

Packed glands drawn up too tight increases power con 
sumption, increases wear on shaft sleeve and shortens 
life of packing. When leakage can no longer be controlled 
by drawing up on the packing gland (#9) add another ring 
of packing (#28) to the stuffing box. After further opera-
tion  and  leakage  again  can  no  longer  be  controlled  re-
place the packing by using the following procedure: 

1. Remove all old packing from the stuffing box. Clean 
box  and  shaft  sleeve  (20)  thoroughly  and  examine 
for  wear.  Replace  shaft  sleeve  if  wear  is  excessive. 
Check bearing by lifting shaft up and down; do not 
expect packing to act as a bearing. 

2.  Use  the  right  cross-section  of  packing,  Gusher 
uses Non-Asbestos packing as our standard for gen-
eral purpose applications. Packing for special appli-
cations available, consult factory. 

3. When using coil or spiral packing always cut the 
packing  into  separate  rings.  Never  wind  a  coil  of 
packing into a stuffing box. Rings can be cut either 
with butt (square) joint or diagonal joints. 

The best way to cut packing rings is to cut them on a 
mandrel the same diameter as the shaft sleeve. Hold 
the coil packing tightly and firmly on the mandrel but 
do not stretch excessively. Cut the ring and try it in 
the  stuffing  box  to  make  certain  it  fills  the  packing 
space properly with no gap in the joint at the O.D. of 
the ring. 

Содержание GUSHER PUMPS 7600 H Series

Страница 1: ...ruction manual instruction manual 7600 H and 7650 H SERIES GUSHER PUMPS INC 115 INDUSTRIAL DRIVE WILLIAMSTOWN KY 41097 PHONE 859 824 3100 FAX 859 824 7428 www gusher com MAINTENANCE INSTALLATION OPERATIONS ...

Страница 2: ...iption Chart 13 Cross Sectional Drawings 14 18 Maintenance History 19 Engineering Data 19 WARRANTY Gusher Pumps Inc will replace or repair within one year of shipment from our plant any pump in our judgement that has failed due to defects in materials or workmanship provided the pump has been properly installed and maintained and has not been subject to abuse These pumps must return to Gusher Pump...

Страница 3: ...the pump should be located as near the source of supply as possible Allow ample room for inspection and maintenance If your pump is not going to be installed within six months several precautions must be taken 1 Preservative treatment of bearings and machined surfaces is required 2 Remove packing on pumps with packed stuffing box the stuffing box and shaft sleeve must be oil lubricated to also pro...

Страница 4: ...s points around the periphery of the coupling DO NOT rotate the coupling If offset ex ceeds 010 re align the coupling See Fig 3 Check angular alignment with micrometer or caliper Measure from the outside of the one flange to the outside of the other flange at intervals around the periphery of the coupling DO NOT rotate the coupling The difference between the maximum and minimum must not exceed 010...

Страница 5: ...n line must be tight for proper oper ation of the pump Install a gate valve in discharge line as close to the pump as possible see Fig 6 If a foot valve is not used in the suction line it is good practice to bell out suction pipe to lower the entrance velocities at the inlet Fig 8 Whenever possible the end of the suction should be a minimum of 3 below the low liquid level Fig 8 The liquid near the...

Страница 6: ...ted at the Gusher Plant and should not require additional lubrication for approximately 1200 hours of operation A well planned maintenance schedule can only be devised after the first six months of operation and the lubrication record re view at that time Each pump installation is unique and requires individual attention to set up the proper lubrica tion schedule for each specific installation Abo...

Страница 7: ...y packed pump Excessive leakage during the first hour of operation will result in a better packing job over a longer period of time Final adjustment should allow approximately 30 drops per minute to leak from the packing 7 When specified Gusher can provide means of lu bricating the shaft and packing through a lantern ring by supplying water oil grease or liquid handled in the pump 8 If the stuffin...

Страница 8: ...r 12 does not rub intake flange 25 or impeller hous ing 11 If impeller does rub repeat steps 1 through 7 Fig 9 RECOMMENDED SPARE PARTS If a spare pump cannot be justified Gusher recommends several parts be kept in your stock for emergency situations We recommend 1 Mechanical Seal 2 Set of Packing 3 Impeller 4 O rings 5 Drive Key 6 Gaskets 7 Ball Bearings 8 Shaft Sleeve 9 Oil Seals 10 Impeller Reta...

Страница 9: ...pressed onto it by ram pressure against a piece of soft metal tubing as shown in Fig 11 The tubing must be clean inside and out and the inside diameter of the tubing should be slightly greater than the bearing bore The ends of the tubing should be square with corners chamfered to avoid flaking and should contact only the bearing inner ring The shaft must be held in line with the ram of the arbor p...

Страница 10: ...ll 9 Foot valve too small 10 Foot valve or suction opening not submerged deep enough NOT ENOUGH PRESSURE 1 Speed too low 2 Air in water 3 Mechanical defects Wear ring is worn Impeller damaged 4 Impeller diameter too small VIBRATION 1 Bent shaft 2 Pipe strain 3 Impeller clogged 4 Coupling alignment off PUMP WORKS FOR A WHILE AND THEN LOSES SUCTION 1 Leaky suction line 2 Water seal plugged 3 Impelle...

Страница 11: ...8 from stem 7 Unbolt stem plate 18 from seal packing gland 9 Remove stem plate On packed pumps the pack ing 28 and shaft sleeve 20 Usually will come off with the stem plate 3 Remove shaft sleeve 20 from shaft 1 Me chanical seal 23 will come off with shaft sleeve 20 Remove seal 23 from sleeve 20 4 Remove packing 28 and shaft sleeve 20 from either shaft 1 or stem plate 18 5 Remove seal packing gland...

Страница 12: ...Seal Gland Cartridge Impeller Housing Impeller Cartridge O ring Oil Seal Shaft Sleeve Gasket Bearing Retainer Gasket Packing Seat Washer Stem Plate Ball Bearing Housing Shaft Sleeve Oil Breather Oil Seal Mechanical Seal Steam Plate Gasket Intake Flange Impeller Lock Nut Intake Flange Gasket Packing Pedestal Seal Gland Gasket Impeller Housing Bracket Coupling see page 9 Coupling Sleeve see page 9 D...

Страница 13: ...14 51H 52H POWER FRAME No Shaft Sleeve 51H 52H POWER FRAME With Standard Impeller Retaining Bolt ...

Страница 14: ...15 51H 52H POWER FRAME With Special Impeller Lock Nut 7071M POWER FRAME With Special Impeller Lock Nut ...

Страница 15: ...16 Center Line Housing With 7071L POWER FRAME ...

Страница 16: ...17 7071S POWER FRAME Threaded Impeller For 7071S 7071M 7071L POWER FRAME ...

Страница 17: ...18 CLOSE COUPLED STYLE ...

Страница 18: ...____________________ ENGINEERING DATA POWER FRAME 51H 52H 7071S 7071M 7071L 1 RADIAL BRG 41207 41209 41207 41309 41313 2 THRUST BRG 41307 41309 41306 DR 41309 DR 41313 DR 3 BALL BRG SPAN 6 748 8 897 4 124 6 868 9 242 4 SHAFT DIA S RADIAL BRG 1 378 1 771 1 378 1 771 2 559 THRUST BRG 1 378 1 771 1 181 1 771 2 559 COUPLING 1 249 1 499 874 1 124 2 374 OIL CAPACITY OF POWER FRAMES 51H 1 1 4 pt approx 5...

Страница 19: ...al turbine pumps positive displacement pumps gear pumps and other specialized pump equipment while upholding its reputation as a leader in the custom engineering of pumps for the most challenging applications RC 0 20 www Gusher com GUSHER PUMPS LOCATIONS Williamstown Headquarters 115 Industrial Road Williamstown KY 41097 Phone 859 824 5001 Fax 859 824 3011 Email Info Gusher com Dry Ridge Manufactu...

Отзывы: