Rupes HB 525 Скачать руководство пользователя страница 4

 

 

2. 

From the point selected for the arm installation, draw a  perpendicular line using a plumb line. Start 

from a  height of 4.6 m. This line corresponds to the CENTRE of the arm wall anchoring yoke. 
ALL SUBSEQUENT DIMENSIONS WILL RELATE TO THIS LINE. 

 
 
 

3. 

INSTALLATION OF ARM ANCHORING YOKE 

At a height of 2.5 m from the ground, move 50 mm to the right from the CENTRE and mark the first hole 
there (Fig. 2). Start drilling the hole (diameter 16 mm, depth 90 mm). This hole matches the upper right hole 
in the yoke (Fig. 3). Place the pin and slightly screw it in. Mark the other holes using a spirit level to get them 
parrallel (Fig. 4). Move the yoke and start drilling, place pins, and fasten all elements after checking they are 
parallel with a spirit level.Before installing the arm check that the pins firmly hold the arm base (Fig. 5 – Fig. 
6). 

 
 
 

4. 

FASTENING OF THE ARM TO THE YOKE 

Lift the arm to the height of the yoke and insert the hinged pins. Follow the proper order of operations (Fig. 
7). 

 
 
 

ATTENTION: 
Only authorised and specialised personnel may perform the arm installation operations. 

Содержание HB 525

Страница 1: ...1 HB 525 HB625 PAT Multifunctional swing arm OPERATING AND MAINTENANCE INSTRUCTIONS ...

Страница 2: ...et place in an atmosphere containing gas vapours or in a place where inflammable liquids are stored Protect yourself against electric shock Avoid contact with earthed objects or surfaces e g metal parts pipes radiators furnaces etc Never leave the device in place accessible for children or unauthorised persons In particular make sure that no unauthorised person has access to the unit Do not overlo...

Страница 3: ...r compressed air with flow capacity 1500 l min max pressure 8 bar 1 quick connection for dry compressed air with pressure regulator and manometer one double dust extraction coupling 1 16 A electric socket 2 16 A electric socket 3 Lighting switch 4 Lamp with 300 W halogen bulb 5 Voltage indicator 6 Fuse 7 MAN 0 AUT switch 8 Safety cut out switch 9 Compressed air connection terminal 10 Dry compresse...

Страница 4: ... 16 mm depth 90 mm This hole matches the upper right hole in the yoke Fig 3 Place the pin and slightly screw it in Mark the other holes using a spirit level to get them parrallel Fig 4 Move the yoke and start drilling place pins and fasten all elements after checking they are parallel with a spirit level Before installing the arm check that the pins firmly hold the arm base Fig 5 Fig 6 4 FASTENING...

Страница 5: ...5 mm 2 cable for connection with the turbine control cable NOTE REGARDING THE HB525P HB625P ARM One 3 x 2 5 mm 2 cable which supplies the whole arm One 2 x 1 5 mm 2 cable for connection with the turbine control cable ATTENTION All 3 x 2 5 mm 2 cables which supply the arm should be connected to magnetothermal differential switch 6Ka 30 mA 16 A Only authorised and specialised personnel may perform t...

Страница 6: ...ND PNEUMATIC CONNECTIONS DIAGRAM str 6 WIRING DIAGRAM str 8 PNEUMATIC CONNECTIONS DIAGRAM str 10 WIRING DIAGRAM WITH AUTOMATIC PNEUMATIC CONTROLLER str 11 WIRING DIAGRAM str 13 PNEUMATIC CONNECTIONS DIAGRAM str 14 ...

Страница 7: ...ith the electrical system or compressed air supply system b mechanical damage caused by operation inconsistent with the enclosed operating instructions c any damage caused by operation inconsistent with the enclosed operating instructions d damage being the consequence of repairs carried out in any place other than warranty repair centre e operation actions specified in the operating instructions ...

Страница 8: ...8 NOTES ...

Страница 9: ...9 Poland 05 083 Zaborów Borzęcin DuŜy ul Warszawska 749 tel 022 752 06 00 fax 022 752 05 92 e mail nts nts com pl http www nts com pl ...

Отзывы: