Runxin J120 Series Скачать руководство пользователя страница 2

 

 

Catalogue

 

  Preface ...................................................................................................................... 

 

1.Product Profile .......................................................................................................... 

 

2.Working Principle ..................................................................................................... 

 

3. Assembly & Parts .................................................................................................... 

 

4.Specification & Active Carbon Volume ...................................................................... 

 

5. Application Range ................................................................................................... 

 

6. Technical Parameters .............................................................................................. 

 

6.1 Parameter Table ................................................................................................ 

 

6.2 Working Condition .............................................................................................. 

 

7. Function and Characteristics ................................................................................... 

 

8.Installation ................................................................................................................ 

 

8.1Installation Condition ........................................................................................... 

 

8.2Installation and Connection ................................................................................. 

 

8.3Control Valve Set and Usage .............................................................................. 

 

 The Function of Control Panel and Parameter Setting ..................................... 

 

 Parameter Set .................................................................................................. 

 

 Flow Chart ....................................................................................................... 

 

9.Usage Illustration ......................................................................................................  

10.Notice ..................................................................................................................... 

 

11.Troubles-Shooting .................................................................................................. 

 

12.Maintenance ........................................................................................................... 

 

13.Warranty Guidance .................................................................................................  

 

Содержание J120 Series

Страница 1: ...ease read this manual in details before using the device and keep it properly in order to consult in the future Note The design and specifications are subject to the changes without prior notice We re...

Страница 2: ...eters 6 1 Parameter Table 6 2 Working Condition 7 Function and Characteristics 8 Installation 8 1Installation Condition 8 2Installation and Connection 8 3Control Valve Set and Usage The Function of Co...

Страница 3: ...good filtering effect automatic rinsing and long life time It removes the harmful things efficiently such as residual chlorine abnormal smell rust mud etc After the active carbon disabled the device c...

Страница 4: ...P Tank 5 Strainer 3 Riser Pipe 6 Quartz Sand 4 Specification and Active Carbon Volume Model FRP Tank Size h mm FRP Tank Model Active Carbon Volume L Quartz Sand Volume L RL J50 258 330 1013 5 4 RL J60...

Страница 5: ...1500 5 RL J180 1800 6 6 2 Working Condition Working Condition Working Pressure 0 15MPa 0 4MPa Water Temperature 5 38 Working Environment Environment Temperature 4 40 Relative Humidity 95 25 Electrical...

Страница 6: ...hold the and buttons for 5 seconds to unlock This function can avoid incorrect operation 8 Installation 8 1 Installation Condition Place the product on the flat surface that can bear the weight more...

Страница 7: ...let is closed connect it with the device All of pipeline that used should meet the relevant regulations and the installation should accord with the local installation rules When install please keep a...

Страница 8: ...soft tube and metal clamp from the spare part kit make the drain connector insert into soft tube as much as possible the insert part is no less than 20 mm In winter the temperature is low use the hot...

Страница 9: ...g the gravity from the pipeline Notice Please make sure the drain line and overflow line is connected and close to sewer making the waste water flow into the sewer rapidly 8 3Control Valve Set and Usa...

Страница 10: ...ample If the quality of outlet water fails after unlocking the buttons press in service status it will start regeneration cycles instantly During the cycle of regeneration if you want finish current s...

Страница 11: ...both and for 5 second until lights off 1 Press and enter into the interface of Set Filter Para as the figure J1 shows The item of Set Time of Day will be selected by system automatically 2 Then press...

Страница 12: ...te value 4 Lastly press and hear a sound Di then finish adjustment J3 Background parameter inquiry and setting Operated by manufacturer or professional dealer A Enter background mode Within 6 seconds...

Страница 13: ...u need Press to save the setting and turn back to H1 or press to turn back to H1 without saving the setting d In the H2 interface select Set Backwash and press as the figure A4 shows Press or to selec...

Страница 14: ...he first time usage Press to back to Service status open the faucet to check if the water is clean If the water is still carbon color it needs more backwash and fast rinse Illustration The purpose of...

Страница 15: ...times of backwash and fast rinse 10 5 If the water demand is increasing Compared to usual demand or the raw water quality is reducing please add the backwash and fast rinse times 10 6 As the product...

Страница 16: ...he valve body B Close the bypass valve until the power is on 7 All indicators display on display board A Wiring of display board with control board fails to work B Main control board is faulty C Adapt...

Страница 17: ...ctive carbon the length of riser tube should be neither higher nor 10mm lower than the tank top opening height and its top end should be rounded to avoid damage of O ring inside the valve 2 Avoid floc...

Страница 18: ...ric shock earthquake etc The damage is result from the disassembly or refits by user or repair by non scheduled maintenance unit The damage is caused by the improperly transportation installation usag...

Отзывы: