
60
Runco VX-22i Installation/Operation Manual
PRE
L
IMINAR
Y
6.
Install the new lamp module.
7.
Replace the lamp cover and re-tighten all
screws.
5.2
Filter Replacement
Whenever you replace the lamp – or more often if the projector is installed in an extremely
dusty environment – you should also replace the filter located at the right side of the
projector.
1.
Loosen the four captive screws
holding the filter access panel in
place. Then, remove the panel.
2.
Pull the filter out of the projector
and discard.
Do not reu
s
e filter
s
.
3.
Insert the new filter with the pleats
facing in and the foam-covered
side facing out.
4.
Replace the filter access panel and
tighten the screws to secure it.
S
ide Filter
Acce
ss
Panel
Содержание NLMP22109
Страница 1: ...INSTALLATION OPERATION MANUAL VX 22i 1080p 3 chip Digital Light ProcessingTM Projector...
Страница 2: ......
Страница 12: ...Table of Contents xii Runco VX 22i Installation Operation Manual P R E L I M I N A R Y Notes...
Страница 14: ...List of Figures xiv Runco VX 22i Installation Operation Manual P R E L I M I N A R Y Notes...
Страница 58: ...44 Runco VX 22i Installation Operation Manual P R E L I M I N A R Y Notes...
Страница 76: ...62 Runco VX 22i Installation Operation Manual P R E L I M I N A R Y Notes...
Страница 80: ...66 Runco VX 22i Installation Operation Manual P R E L I M I N A R Y Notes...
Страница 86: ...72 Runco VX 22i Installation Operation Manual P R E L I M I N A R Y Notes...
Страница 87: ......