锐捷以太网 PoE 供电交换机快速安装指南
Quick Installation Guide of Ruijie Ethernet PoE Switches
本指南适用于
RG-NBS1805C-P
和
RG-NBS1809C-P
。
This quick installation guide applies to RG-NBS1805C-P and RG-NBS1809C-P.
1.
设备安装
Installing the switch
安装到墙壁
Wall mounting
*
仅适用于
RG-NBS1805C-P
。
*It applies to RG-NBS1805C-P only.
第一步:根据交换机底面壁挂孔位置,在墙上定位并钻孔。
Step 1: Locate and drill holes on the wall according to the distance between the slots on the bottom panel
of the switch.
第二步:将膨胀螺管(自备)打入墙上的孔中,然后拧入螺钉(自备)。确保螺钉头与墙面的间距足够用于
挂壁。
Step 2: Knock expansion screws (self-prepared) into the holes, then tighten two screws (self-prepared)
into the holes. Keep an appropriate distance between the inner edge of the screw head and the wall to
ensure that the switch can be hung on the screws firmly.
第三部:将交换机底面壁挂孔对准螺钉头,滑入并扣紧。
Step 3: Align the slots of the switch to the screw heads, and slip the switch to make it fixed on the screws
firmly.