3
Product Installation
Note
Make sure you have carefully read the contents of Chapter II.
Make sure the requirements described in Chapter II have been
satisfied.
3.1
Installation Flow
3.2
Verifications Before Installation
Verify the following points before the installation:
Whether the installation site satisfies the requirements on temperature and humidity;
Whether the installation site satisfies requirements on electric current and whether
the power supply is ready.
Whether the relevant network cables have been deployed at the installation site.