Ruijie RG-AP130(W2) V2 Series Скачать руководство пользователя страница 10

·

 

Hardware Installation and Reference Guide                                                                                              Preparing for Installation 

 

 

(Particles/m

3

Besides,  the  contents  of  salts,  acids  and  sulfides  in  the  air  are  also  strictly  limited  for  the  equipment  room.  These 

substances can accelerate metal corrosion and the aging of some parts. Table 2-3 describes the limit of some hazardous 

gases such as SO

2

, H

2

S, NO

2

 and Cl

in the equipment room.       

Table 2-2 

Gas 

Average (mg/m

3

)   

Maximum (mg/m

3

)   

SO

2

 

0.2   

1.5   

H

2

0.006   

0.03   

NO

2

 

0.04   

0.15   

NH

3

 

0.05   

0.15   

Cl

2

 

0.01   

0.3   

2.5  EMI Consideration 

Various interference sources, from either outside or inside the equipment or application system, affect the system in the 

conductive ways such as capacitive coupling, inductive coupling, and electromagnetic radiation. There are two types of 

electromagnetic  interferences:  radiated  interference  and  conducted  interference,  depending  on  the  type  of  the 

propagation path. When the energy, often RF energy, from a component arrives at a sensitive component via the space, 

the energy is known as radiated interference. The interference source can be both a part of the interfered system and a 

completely  electrically  isolated  unit.  Conducted  interference  results  from  the  electromagnetic  wire  or  signal  cable 

connection between the source and the sensitive component, along the cable the interference conducts from one unit to 

another.  Conducted  interference  often  affects  the  power  supply  of  the  equipment,  but  can  be  controlled  by  a  filter. 

Radiated interference may affect any signal path in the equipment, and is difficult to shield. 

 

Effective measures should be taken for the power system to prevent the interference from the electric grid.   

 

The  working  ground  of  the  routers  should  be  properly  separated  and  kept  as  far  as  possible  from  the  grounding 

device of the power equipment or the anti-lightning grounding device.   

 

Keep  the  equipment  away  from  high-power  radio  transmitter,  radar  transmitting  station,  and  high-frequency 

large-current device. 

 

Measures must be taken to isolate static electricity. 

2.6  Installation Tools 

Common Tools 

Phillips screwdriver, straight screwdriver, related copper and fiber cables, bolts, diagonal pliers, 

cable ties 

Special Tools 

Anti-static tools 

Meter 

Multimeter 

 

The listed tools, apart from bolts, are customer supplied. 

 

Содержание RG-AP130(W2) V2 Series

Страница 1: ...Ruijie RG AP130 W2 V2 Series Access Points Hardware Installation and Reference Guide 1 00...

Страница 2: ...or by any means without the prior written consent of Ruijie Networks is prohibited Exemption statement This document is provided as is The contents of this document are subject to change without any n...

Страница 3: ...ty https community ruijienetworks com Technical Support Email service_rj ruijienetworks com Skype service_rj ruijienetworks com Related Documents Documents Description Configuration Guide Describes ne...

Страница 4: ...1 Technical Specifications Table 1 1 Technical Specifications of RG AP130 W2 V2 Hardware Specifications Radio 2 4G 2 x 2MIMO 5G 2 x 2SU MU MIMO Transmission Protocol 2 4G 802 11b g n 5G 802 11a n ac...

Страница 5: ...g 0 C to 45 C 32 F to 113 F Storage 40 C to 70 C 40 F to 158 F Humidity Operating 10 to 95 RH non condensing Storage 5 to 95 RH non condensing Installation Ceiling wall mount in a 86 type faceplate IP...

Страница 6: ...2 V2 PoE UpLink port which is on the rear is the 10 100 1000Base T WAN port PoE capable Four 10 100 1000Base T LAN ports are on the bottom Figure 1 2 Side View of RG AP130 W2 V2 Note 1 Reset button 2...

Страница 7: ...linking green 0 4Hz AP is operational and CAPWAP connection is established At least one client is associated Reset button Pressed for less than 2s Reboots the device Pressed for more than 3s Restores...

Страница 8: ...57V Rated current 0 25A DC power supply Input voltage range 12V Rated current 1A When powered through PoE the AP can be used with Ruijie s other products supporting 802 3af PoE 1 5 Cooling Solution Th...

Страница 9: ...ters away from the seaside and do not face it toward the wind from the sea The installation site should be free from water flooding seepage dripping or condensation The installation site shall be sele...

Страница 10: ...ference source can be both a part of the interfered system and a completely electrically isolated unit Conducted interference results from the electromagnetic wire or signal cable connection between t...

Страница 11: ...have been met 3 1 Installation Flowchart 3 2 Before You Begin To ensure normal operation and a prolonged useful life of the equipment observe the following safety precautions Install the device in a...

Страница 12: ...he device before install or move it Make sure that the screws are of fine quality Be sure that the equipment is installed in a place where it is easy to be observed 1 Loosen screws on the 86 type face...

Страница 13: ...Access Point 3 Connect the uplink cable to the UpLink port Figure 3 3 Tighten Screws with a Screwdriver 4 Slide down the AP into the plate Figure 3 4 Mounting the AP into the Plate 5 Use an M3x4 screw...

Страница 14: ...ink port WAN on the AP Figure 4 1 Connect the Ethernet Cable to the UpLNK Port DC power adapter power supply When applying DC power supply plug one end of the Ethernet cable into the PoE UpLink port a...

Страница 15: ...Restore Default Settings The reset button is hidden in a hole and used by technical support personnel To avoid abnormal operation do not use this button without consultation with technical support pe...

Страница 16: ...lty Blinking green 0 4Hz The AP is operational The CAPWAP connection is OK At least one client is associated with the AP Blinking green one flash every 4 seconds The AP is operational No clients are a...

Страница 17: ...le is connected Verify that the device at the other end of the Ethernet cable is working properly And then verify that the Ethernet cable is capable of providing the required data rate and is properly...

Страница 18: ...imum distance of 100 meters 328 feet 1000BASE T requires all four pairs of wires be connected for data transmission as shown in Figure A 1 Figure A 1 1000BASE T Connection 10BASE T uses Category 3 4 5...

Отзывы: