Installation and Reference Guide
100G QSFP28 Modules
Figure 6-10 Schematic Diagram for Pulling out the pull-tab QSFP28 Optical Module
Installing the 100G QSFP28 Cable Module
100G QSFP+ cables include copper cables and AOC cables.
1. When installing the plug of the 100G QSFP28 cable module (with power-on), users can use one hand to hold the plug
of the cable module, and the other hand to lift the cable to the direction that is vertical with the front panel of the switch port
to make sure the installation direction of the QSFP28 module at the end of the cable is correct and then gently and
smoothly insert it into the QSFP28 slot until a click sound is heard. This indicates that the 100G QSFP28 cable module is
correctly installed. As shown in the Figure 6-11 and Figure 6-12:
Figure 6-11 Schematic Diagram for Installing the QSFP28 Copper Cable