background image

RG-EasyGate Series Hardware Installation Guide V1.60 

 

 

 

 

 

 

 

RG-EasyGate Series Products 

Hardware Installation and Reference Guide V1.60

Содержание EG3250

Страница 1: ...RG EasyGate Series Hardware Installation Guide V1 60 RG EasyGate Series Products Hardware Installation and Reference Guide V1 60...

Страница 2: ...this document in any form or by any means without the prior written consent of Ruijie Networks is prohibited Exemption Statement This document is provided as is The contents of this document are subje...

Страница 3: ...stance Ruijie Networks Website https www ruijienetworks com Technical Support Website https ruijienetworks com support Case Portal http caseportal ruijienetworks com Community http community ruijienet...

Страница 4: ...configuration commands can easily use this product without training Ruijie EG Series Breakout Gateways Ruijie EG3250 Breakout Gateway Appearance of Ruijie EG3250 Breakout Gateway Figure 1 1 Front Pan...

Страница 5: ...232 Dimension W x H x D 440mm x 43 6mm x 200mm excluding the foot pad Voltage 100VAC to 240VAC 50 60 Hz 0 65A Power Consumption Less than 25W Working Environment Temperature 0 C to 45 C 32 F to 113 F...

Страница 6: ...t Gateway Full Support to Extensive Protocols Ruijie EG series breakout gateway is applicable to different network environment as it provides full support to extensive protocols Providing RJ45 port an...

Страница 7: ...nd user based real time flow analyzer provides detailed information on source destination IP address service port application protocol session number and flow size Supporting user source IP address de...

Страница 8: ...e and other deployment modes meeting the need for deployment in various contexts The transparent bridging does not change the configurations of other devices allowing complete URL filtering flow contr...

Страница 9: ...he clock If the clock is not set the time may not be correct if the clock has been set precisely and the time is still incorrect the built in button cell of device may have ran out which is typically...

Страница 10: ...4 m ahead of the equipment frame when there is no protection plate on the front and rear side of the equipment frame Short term working condition refers to the continuous operation no exceeding 48 ho...

Страница 11: ...bag When observing or transferring the circuit board of breakout gateway touch the outer edge of circuit board and avoid direct contact with the components on the circuit board Anti Interference Requ...

Страница 12: ...essories Make sure the cabinet and workbench is properly grounded Installation Tools and Devices To enable smooth installation prepare the following items Installation tools Connecting cables Related...

Страница 13: ...reserve a heat elimination room of 10 cm around the device Do not place heavy things on the device Installing Power Cables The requirements of Ruijie EG series breakout gateway products on AC power s...

Страница 14: ...attributes of a console are shown in Table 3 1 In case of WEB based configuration the console port will be of no use Table 3 1 Attributes of the Console Connection Parameter Description Connector RJ 4...

Страница 15: ...connected and whether the microcomputer or terminal for gateway configuration is started or configured Before powering on the breakout gateway be aware of the location of the power switch of the break...

Страница 16: ...LED indicators If abnormity occurs perform the following checks Whether the power switch is turned on Whether the power supply of the breakout gateway is turned on Whether the power cable is properly...

Отзывы: