Rugged Interactive
Unit 1, Callywith Court
Callywith Industrial Estate, Bodmin
Cornwall, UK
PL31 2RQ
+44 (0) 1726 981 123
www.rugged-interactive.co.uk
SkyPods
–
Section 2 - Installation
© Rugged Interactive
2019
3.3 - Installation Overview
Below is an overview of the steps needed to install SkyPods. More detail for the process is provided
in the following pages. Please read through ALL of this prior to beginning the installation and if you
are in any doubt, contact Rugged Interactive.
If you have any concerns on how or what the product is installed to, contact a structural engineer
prior to beginning the installation.
STEP 1:
Mark out position for the pods and scorebox.
STEP 2:
Cut necessary holes.
STEP 3:
Mount scorebox.
STEP 4:
Run cables from scorebox to pods.
STEP 5:
Mount pods.
STEP 6:
Turn on SkyPods system.
STEP 7:
Test.
STEP 8:
Check all is secured.
STEP 9:
Stress relief cables.
STEP 10:
Enjoy SkyPods!