 Installation 

 

Read this manual before installing SkyPods.

 

Installation Guidelines: 

§

  Complete the 

Site Survey

 form prior to delivery and/or installation.  

§

  Send a completed 

Installation Checklist

 after any installation to Rugged Interactive. 

§

  A typical installation should take 2 people about 2 hours.  

§

  No obstructions or protrusions in the installation area: e.g. skirting boards, pipes, cables and wiring 

conduits. 

§

  Avoid trapped and/or pinched cables.  

§

  Use good practice when running data cables to and from products, external pods and sensors. 

Support long cables at least every 50 cm and provide adequate strain relief for connection points. 

§

  To prevent electric shock, keep all electric components away from contact with water. 

§

  IMPORTANT: Take anti-static precautions. 

 
Structure: 

§

  The units must be mounted to a flat/level construction capable of supporting its weight and 

gameplay. (Uneven walls and surfaces make alignment and fitting very difficult.) 

§

  Mount onto 18 mm plywood (12 mm minimum) mechanically mounted to a steel framework (50 mm 

box minimum). The plywood should be covered with foam-backed vinyl.  

§

  Units can either be secured on top of the foam-backed vinyl, or embedded in a purpose-made cut-

out. Adequate holes will need to be cut during installation to provide clearance for cable access to 
rear if required. 

§

  Avoid clashing the steel uprights with the fixing holes.  

§

  Do not fix to plasterboard faced partition. Avoid stud walls or unsupported portal infills.  

§

  It is strongly recommended that the units are installed onto a wall that projects forward at least 0.3 

m over the edge of the trampoline. This ensures that users land in the middle of the trampoline bed. 

 
Fixings: 

§

  The manufacturer will supply fixings and plugs.  

§

  Use hex-headed screws of 50-70 mm length (2”) x M10 for a plywood structure. 

§

  10 x 35 ‘penny’ washers to spread the load at each bolt head are recommended.  

§

  All fixings must be tight and secure. 

 
Installation Heights: 

§

  Take into consideration individual trampoline park primary user groups and the relative bounciness 

of trampolines when determining the installation height.  

§

  Recommended installation heights: See 

Figure 2.2

 

Содержание High-9

Страница 1: ...llation and Instruction Manual For models from March 2017 onwards Rugged Interactive Unit 7 Windmill Industrial Estate Windmill Road Fowey Cornwall UK PL23 1HB 44 0 1726 981 123 www rugged interactive...

Страница 2: ......

Страница 3: ...l UK PL23 1HB 44 0 1726 981 123 www rugged interactive co uk hello rugged interactive co uk Rugged Interactive 2017 Contents Section 1 Safety Guidelines Section 2 Installation Section 3 How to Use Sec...

Страница 4: ......

Страница 5: ...ameplay If possible avoid stud walls or unsupported portal infills If in doubt always contact a suitably qualified surveyor to check Visually check the product for any signs of damage component failur...

Страница 6: ...r to participation Long hair should be tied back Before use loosen up with warm up exercises and stretches Practice being in control of your bounce before using the equipment Be aware of how to bend y...

Страница 7: ...moves unless you know you are capable and have had the appropriate training No double flips triple flips diving or gainers even if you are capable Do not distract others while they are using the equi...

Страница 8: ......

Страница 9: ...ght and gameplay Uneven walls and surfaces make alignment and fitting very difficult Mount onto 18 mm plywood 12 mm minimum mechanically mounted to a steel framework 50 mm box minimum The plywood shou...

Страница 10: ...onment Keep out of direct sunlight bright sunlight can affect the LED pod sensors Keep indoors and dry Optimum ambient temperature 5 C to 30 C Avoid extreme fluctuations of temperature Other Recommend...

Страница 11: ...6 6 B 1 811 19 0 0 60 3 01 86 3A D 10 3 01 3 13 34 58 19 60 3 0 03 EF 6 01 0 G80 3 0 1 6 11 6 1 1 34 K16 9 LZ 81 03 1 81 B0 A 6 11 6 HE 60 3 Q 3 0 a D 6 3 1 19 6 11 6 1 1 3 0 D 89 B0 06 9 LZ 81 4 3 6...

Страница 12: ...High 9 Installation and Instruction Manual Section 2 Installation Section 2 4 Rugged Interactive 2017 3 2 B8B 9 LZ K 1 0 1 01 13 0 0 1 9 3 OFF L SFF OFF L SFF EFF L OFFF B I C H 0 1 TEF TFF...

Страница 13: ...19 01 38 0 3 L 0 19 B 36 B3 1 38 06 0 0 4 H Ca 601 6 33 83 B 38 06 0 D 1 0 L 06 1 1 6 330 4 6 1 0 3 1 3 6 1 03 6 0 3 1 36 34 L1 0 3 D 3 0 0 3 0 D4 01 02 03 7 03 3 D Y4 7 3 0 D 1 6 4 L1 H 3 0 D 1 6 B...

Страница 14: ...allation Section 2 6 Rugged Interactive 2017 04 05 06 C3 0 0 D 193 81 3 0 D B0 4 7 06 3 0 D 1 6 4 L1 H 3 0 D 1 6 B 0 60 3 1 19 8 B 06 D4 _138 0 60 3 0 6 6 6 11 6 4 C 5 2 2 D 3 021 1 28 _138 60 3 0 86...

Страница 15: ...d Interactive 2017 D 6 2 O E1 S 7OU 9 1 X D IJ 83 19 01 38 0 3 L 0 19 B 36 B3 1 38 06 0 0 4 H IJ 601 6 33 83 B 38 06 0 D 1 0 L 06 1 1 6 330 4 6 1 0 3 1 3 6 1 03 3 0 81 34 01 02 03 IJ 1 4 IJ 06 4 J 89...

Страница 16: ...llation and Instruction Manual Section 2 Installation Section 2 8 Rugged Interactive 2017 CAT5 Cable Connections Notes The MPL power cable PWR can be connected to either unit Cables come out the back...

Страница 17: ...gh 9 will sound a laugh and will turn to its idle state Initially the dot matrix on the display box will display the Hub Software Version Number for the High 9 unit High 9 has one programs 1 High 9 1...

Страница 18: ......

Страница 19: ...nds the bottom 6 pods will appear green then yellow then red After 3 more seconds all 9 pods will appear green then yellow then red This rotation of pod clusters will repeat On selection of any illumi...

Страница 20: ......

Страница 21: ...27 8 94 2 34 1 5 2 2 A5 443 B11 30 25 4C8 4D 93178 C569E 8 F4C58 84 2 G266 4D 2 C982H61 745 83C78945 I 89JCJ 2JH9158 81J 1328C31 K 84 K 49 1L831J1 2 66 238 1 9E51 D43 12 0 J2958152571 M1 6271J158 N O...

Страница 22: ......

Страница 23: ...or pinched cables No loose cables that could become a tripping hazard All long cables are supported at least every 50 cm Adequate strain relief provided for connection points Kept out of direct sunlig...

Страница 24: ...are hit Program plays as described in the Programs Guide on both units Check 5 Ready for use Play area is clear Instruction training carried out by an appropriate instructor to all new users If anythi...

Отзывы: