Model LR-26C, LR-623, LR-28A, & LR-2355 Sub-Frame Hoist Installation and Operation Manual
Stock No. 1657499
Page 12 of 25
IMPORTANT:
Several different types of hydraulic components are used to power this hoist. All
hydraulic systems supplied by TBEI-Rugby have an installation and operation manual
included with them. For installation and operation information, refer to the Installation
and Operation Manual for your particular hydraulic components.
BE SURE
to read and
understand this manual and the installation and operating instructions included with the
hydraulic system before you attempt to operate this hoist.
WARNING:
Installing or operating this hoist without first understanding the proper installation and
operation procedures can lead to serious injury or death. Always read and understand fully
all installation and operation manuals before installing or operating this equipment.
NOTE:
Before operating the hoist, read the
"OPERATION"
section of this manual
WARNING:
If it is necessary to work on the hoist or body while in the raised position,
ALWAYS
block the unloaded body up securely with the body prop or body props.
14.
Place a complete operation manual in the glove compartment of the truck. This manual MUST BE
available for reference by the operator when needed.
WARNING:
If the hydraulic system used to power this hoist was supplied by TBEI-Rugby, an
operation manual will be included with the hydraulic components. The operation manual
for this hydraulic system
MUST BE
supplied to the operator.
WARNING:
If the hydraulic system used to power this hoist was supplied by someone other than
TBEI-Rugby, an operation manual for this hydraulic system
MUST BE
obtained and
supplied to the operator.
15.
Install all decals. Refer to
"DECAL LOCATION"
section of this manual.