background image

 

26 

9. APPENDIX 

9. ПРИЛОЖЕНИЕ 

9.1 Hydraulic schematic drawing: 

9.1 Гидравлическая схема: 

 

 
 
 
 
 
 
 
 
 
 

1.3 sub cylinder 

1.3 вспомогательный цилиндр  9 gear pump 

9 шестерёнчатый насос 

2.4 main cylinder 

2.4 главный цилиндр 

10 flow control valve 

10 клапан управления  

5 stop valve 

5 запорный клапан 

11 pump motor 

11 мотор насоса 

6 check valve 

6 контрольный клапан 

12 filter 

12 фильтр 

7 overflow valve 

7 перепускной клапан 

13 oil tank 

13 масляный резервуар 

8 descent valve 

8 клапан спуска 

 

 

 

 

 

 

 

Содержание RLSS-301

Страница 1: ...Small scissor lift RLSS 301 3 0T RLSS 301 3 0 USER S MANUAL Operating Manual Instructions Ref B3 GC 3 0SS user s manual 20090821 19 2012 Serial No Year of Manufacture...

Страница 2: ...peaking users However if you have any questions remarks or notes caused by this manual please contact our specialists immediately RUDETRANSSERVICE Ltd Russia 173003 Velikiy Novgorod B Saint Petersburg...

Страница 3: ...y 3 11 Chapter 4 Installation 4 15 Chapter 5 Adjustment 5 18 Chapter 6 Operation 6 21 Chapter 7 Maintenance and care 7 22 Chapter 7 Failure and resolutions 8 23 Chapter 9 Appendix 9 26 9 1 Hydraulic s...

Страница 4: ...hat all items specified in the delivery notes are included In case of missing parts possible defects or damage due to transport the person in charge or the carrier must be immediately informed Further...

Страница 5: ...ized personnel from the licensed dealer or an service center authorized by the manufacturer The manufacturer declines all responsibility for injury to persons or damage to vehicles or objects when any...

Страница 6: ...t for hydraulic failure and over loading So when the oil pipe bursts the machine will not fall quickly Use high quality hydraulic or electric element parts made in Italy Germany Japan and so on Own ma...

Страница 7: ...lift weight kg 3000 3 Main machine Lift height mm 960 4 Platform initial height mm 105 5 Platform length mm 1450 6 Platform width mm 530 7 Lifting time s 50 8 Descent time s 60 9 Overall length mm 204...

Страница 8: ...0 5A 220 10A Max Frequency Hz 50 Poles 4 Speed 1450 Building shape B14 Insulation class F When connecting the motor refer to the enclosed diagrams and the motor direction is clockwise PUMP Type P4 3 M...

Страница 9: ...Clean the basic layer thickness of concrete 150mm the leveling of whole length 10mm 150 10 Remarks 1 Fix ground bolts before loading 1 2 The control box can be placed on the left or right side 2 Pict...

Страница 10: ...ifting weight is 3000Kg 3000 THE MAX DIMENSION OF VEHICLE The following diagrams illustrate criteria used to define the operating limits of the lift The lower parts of the vehicle underbody could inte...

Страница 11: ...s for personnel or lifting personnel Use as a press for crushing purposes Use as elevator Use as a lift jack for lifting vehicle bodies or changing wheels The manufacturer is not liable for any injury...

Страница 12: ...to persons and or damage the lift the vehicle or other property RISK OF ELECTRIC SHOCK a specific safety notice placed on the lift in areas where the risk of electric shock is particularly high Risk...

Страница 13: ...0 Picture 9 Picture 10 There is nothing abnormal should be left on the safety modules to prevent safety gear from occlude normally RISKS FOR PERSONNEL This heading illustrates potential risks for the...

Страница 14: ...t and also the platforms must be kept clean Remove any oil spills immediately 12 Picture 11 Risk of impact Picture 12 Risk of slippine RISK OF ELECTRIC SHOCK Risk of electric shock that in area of the...

Страница 15: ...st be 1000 mm at least taking into consideration the necessary space to work easily Because space for the control site and for possible runways in case of emergency is also necessary The 1000 The room...

Страница 16: ...TION Connect the electrical and oil line according to the electric wiring diagram and oil line connection Only after connecting the hydraulic system can connect the air loop can not damage oil pipe wi...

Страница 17: ...ipe COMPRESSED AIR PIPE CONNECTION Follow air loop diagram to connect air loop Only skilled and authorized person is allowed to perform the operations Connect 8 6 compressed air supply pipe to the air...

Страница 18: ...kwise looking downward if not turn off the power then change the phase of the motor UP When turn on power there is high voltage in the control box only authorized person can operate it Turn on the air...

Страница 19: ...ill affect the quality of solidity Adjust the parallel of the platform and the distance of two platforms as Picture 4 requires 4 Fix the anchor bolts with a percussion electric drill percussion drill...

Страница 20: ...acles do the test again SB0 Load of machine test Drive the vehicle whose weight doesn t exceed maximum lifting weight to the platforms and then the driver leaves it Put the lift rubber cushion on the...

Страница 21: ...machine should be lowered to the lowest position on ground and remove vehicle and cut off power supply Instructions on electric operation see the operation panel Picture 24 LIFTING Press UP button the...

Страница 22: ...MERGENCY MANUAL OPERATION FOR LOWERING POWER FAILURE When lowering through manual operation should observe the condition of platform at any time because there are vehicles on the platform If there is...

Страница 23: ...ates when forcing the contactor down with an isolation rod check the control circuit If the voltage at two ends of the contactor coil is normal replace the contactor 2 The motor does not run in liftin...

Страница 24: ...coil of the lowering solenoid valve and check the right turn tightness of its end copper nut and so on 4 When press Lower button the machine is not lowered 5 The antiknock valve is blocked Remove the...

Страница 25: ...e right and left platforms are not synchrono us and not in the same height 3 The oil make up stop valve can not be closed tightly and almost make up oil and adjust every day Replace oil make up stop v...

Страница 26: ...raulic schematic drawing 9 1 1 3 sub cylinder 1 3 9 gear pump 9 2 4 main cylinder 2 4 10 flow control valve 10 5 stop valve 5 11 pump motor 11 6 check valve 6 12 filter 12 7 overflow valve 7 13 oil ta...

Страница 27: ...27 9 APPENDIX 9 9 2 Oil pipe connection diagram 9 2...

Страница 28: ...28 28 9 APPENDIX 9 9 3 Circuit diagram 220V 9 3 220...

Страница 29: ...29 9 APPENDIX 9 9 4 Wiring diagram 220V 9 4 220...

Страница 30: ...30 9 APPENDIX 9 9 5 Circuit diagram 380V 9 5 380...

Страница 31: ...31 9 APPENDIX 9 9 6 Wiring diagram 380V 9 6 380...

Отзывы: