RUD SuperRotation ICE-LBG-SR Скачать руководство пользователя страница 2

2

ICE-LBG-SR

Please read user instruction before initial 

operation of the bolt-on lifting point ICE-LBG-

SR. Make sure that you have comprehend 

all subjected matters.

Non observance can lead to serious per-

sonal injuries and material damage and 

eliminates warranty. 

In doubt or in misconception please note 

that the German version of this document 

is decisive.

1  Safety instructions

ATTENTION 

Wrong assembled or damaged ICE-LBG-

SR as well as improper use can lead to 

injuries of persons and damage of objects 

when load drops.

Please inspect all ICE-LBG-SR before 

each use.

•  Remove all body parts (fingers, hands, arms, 

etc.) out of the hazard area (danger of crushing 

or squeezing) during the lifting process.

•  The ICE-LBG-SR  must be used only by authorised 

and trained people in adherence to BGR/DGUV 

regulations 100-500, Chapter 2.8 and, outside 

Germany,  when  observing  the  relevant  specific 

national regulations.

•  Do not exceed the working load limit (WLL) indi-

cated on the lifting point.

•  Only original ICE-Bolts from RUD must be used.
•  ICE-LBG-SR must be rotatable in the screwed tight 

status through 360 °.

•  No technical alterations must be implemented on 

the ICE-LBG-SR.

•  No people may stay in the danger zone.
•  Jerky lifting (strong impacts) should be prevented.
•  Always ensure a stable position of the load when 

lifting. Swinging must be prevented.

•  Damaged or worn ICE-LBG-SR must never be 

utilised.

2  Intended use 

ICE-LBG-SR lifting points must only be attached at 

a load or used at load accepting means.
Their usage is intended to be used as lifting means.

ICE-LBG-SR are suitable to turn and flip loads. Please 

observe to this the permissible load directions.
RUD ICE-LBG-SR lifting points can also be used as 

lashing points for fixing lashing means. 

ICE-LBG-SR lifting points must only be used in the 

here described operation purpose.

3  Assembly- and instruction manual

3.1  General information

•  ICE-LBG-SR can be used for flipping and turning 

of loads. Please observe the hints at chapter 3.2 

Hints for the assembly

.

•  Effects of temperature: 

 

The WLL of the ICE-LBG-SR lifting points must be 

reduced as follows:

  -40°C  up to 100°C 

 no reduction   

100°C up to 200°C minus 15 % (212 up to 392°F) 

200°C up to 250°C minus 20 % (392 

up to

 482°F) 

250°C up to 300°C minus 25 % (482 

up to

 572°F)

 

Temperatures above 300°C (572°F) are not per-

mitted!

  Please observe the maximum usage temperature 

of the supplied nuts (optionally): 

  •  

Lock nuts acc. to DIN EN ISO 7042 (DIN 980) 

 

must be used to max. +150° C (302°F)

  • 

Collar nuts acc. to DIN 6331 can be used up 

 

to +300°C (572°F). In addition to that observe 

 

the reduction factor

•  RUD-Lifting points must not be used under chemi-

cal influences such as acids, alkaline solutions and 

vapours e.g. in pickling baths or hot dip galvanising 

plants. If this cannot be avoided, please contact the 

manufacturer, indicating the concentration, period 

of penetration and temperature of use.

•  The place where the ICE-LBG-SR lifting points are 

fixed should be clearly marked with colour.

•  RUD ICE-LBG-SR lifting points from RUD are 

supplied with a crack test inspected hexagon bolt 

(length up to Lmax, see table 3).

 

M8-M24: ICE-Bolt   

 

M30: 10.9 bolt

 ATTENTION

  Use only the appropriate strength class of bolt, for 

each specific size. For sizes M8-M24, only original 

RUD-ICE-Bolt must be used.

•  Original bolts (ICE bolt and 10.9 bolts) are available 

as a spare part from RUD.

•  When using 10.9 bolts of the size M30 from other 

suppliers, make sure that they have been 100 % 

inspected in regards of cracks. A written confirma

-

tion of the absence of cracks must be added to the 

documentation. 

  The middle notch toughness at the lowest appro-

ved use temperature must be at least 36 J. This 

is required for the test principles for GS OA 15-04 

lifting points.

HINT

The dismantling / assembling for the ex-

change or inspecting of the bolt may only be 

executed by a competent person (compare 

with Section 3.4 Dismantling / Assembling 

the RUD bolt).

• 

Versions

  •  The metric vario length can either be equipped 

with a washer and a crack detected nut acc. to 

DIN EN ISO 7042 or with a collar nut acc. to 

DIN 6331.

Содержание SuperRotation ICE-LBG-SR

Страница 1: ...________________ _________________ _________________ _________________ F r die Zusammenstellung der Konformit tsdokumentation bevollm chtigte Person Michael Betzler RUD Ketten 73432 Aalen Aalen den 26...

Страница 2: ...rning of loads Please observe the hints at chapter 3 2 Hints for the assembly Effects of temperature The WLL of the ICE LBG SR lifting points must be reduced as follows 40 C up to 100 C no reduction 1...

Страница 3: ...ymetrical Double leg 2 1 Three four leg 3 1 Table 1 Load bearing strands compare also with Table 2 HINT With unsymmetrical loads the WLL of each Lifting Point must be the same as the weight of the loa...

Страница 4: ...must be prevented Prevent damage being caused to the lifting means by loading at sharp edged Set the suspension ring of the ICE LBG SR in the direction of force before attaching the lifting means F P...

Страница 5: ...taining ring together with flat pliers so that it sits deeply in the groove of the nut 3 Now insert the bolt with light hits with a hammer fully into the socket 4 Finally control the tightness of the...

Страница 6: ...h as significant notches particularly in areas subject to tensile stress Easy rotation of the ICE LBG SR must be ensured 4 3 Additional test criteria for the competent person repair worker Cross secti...

Страница 7: ...5 61 49 151 79 110 M30 66 46 17 1000 8504290 Type WLL weight T A B C D E F G H I K L M N SW ISK Torque Ref No ICE LBG SR metr L nge nach Wunsch metr longer vario bolt ICE LBG SR 0 6 t M8 0 6 75 30 52...

Страница 8: ...8 ICE LBG SR...

Отзывы: