background image

4. Assemble  both  parts  of  the  connector  ensuring  all 

components are aligned

 (Pic 7)

.

5. Install load pin into the bore of the eye

 (Pic. 8)

. Both bow 

parts are now connected with each other.

6. Secure the assembled connecting link

 (Pic. 9)

:

  • Position the securing pin.
  • Knock sleeve pin in with a hammer.

7. Finally  check  the  correct  assembly 

(see section 4 

inspection criteria)

.

3.2 Assembly Instructions

3.2.2 Assembly of chain strands (using connectors)

The chain strands are connected to the balancer using IVS 

ICE-Connecting Links.

Sequence of assembly:

1. Install last chain link into the nose

 (Pic. 3)

.

 

NOTE 

At the beginning of the bow rounding, the chain link 
can be turned 90° within the bow 

(Pic.4)

2. Position chain strand to the bottom of the bow part 

(Pic. 5)

.

3. Assemble the second bow part of the connector into the 

balancer plate 

(Pic. 6)

.

Pic 3: Install chain into nose of  
connector.

ICE-BALANCER

User Instructions - Part 2

Pic 5: Lower bow connected to 
chain.

Pic 6: Assembly of the second 
bow part.

Pic 9: Securing of connecting pin.

Pic 4: Turn chain link..

Pic 8: Assembly of connecting pin.

Pic 7: Alignment of second bow 

part with first bow part.

Содержание Ice 120

Страница 1: ...he appropriate level of health and safety of the corresponding EC regulation Any un authorised modification and or any incorrect use of the equipment not adhered to within these user instructions waiv...

Страница 2: ...l load spreading sharing Max inclination angle 45 90 internal sling angle WARNING The 2 leg sling with the balancer should not be used seperatly as a 2 leg sling Lifting means for lifting of loads mus...

Страница 3: ...connected to the balancer using IVS ICE Connecting Links Sequence of assembly 1 Install last chain link into the nose Pic 3 NOTE At the beginning of the bow rounding the chain link can be turned 90 wi...

Страница 4: ...ge A skewing of the balancer under load by more than 10 is prohibited Pic 12 The 10 edge is no longer aligned horizontal The skewing of the balancer is too big WARNING Skewing of the balancer by more...

Страница 5: ...ontinued suitability Also inspect after damage and special occurrences 4 Inspection criteria Check and control the following points before each initial operation in periodical periods after the assemb...

Страница 6: ...ght kg pc Reference Number 6 IAK 2S 6 18 x 90 x 160 265 1 8 7904659 8 IAK 2S 8 26 x 100 x 180 309 4 09 7904660 10 IAK 2S 10 32 x 110 x 200 369 7 37 7904661 13 IAK 2S 13 36 x 140 x 260 467 12 44 790466...

Страница 7: ...s can be assumed to be load bearing This is not valid if it is guaranteed that the load will be distributed equally to 2 additional legs By using the ICE balancer the load distribution of a 2 x 2 leg...

Страница 8: ...ICE BALANCER ICE BALANCER...

Отзывы: