4. Assemble both parts of the connector ensuring all
components are aligned
(Pic 7)
.
5. Install load pin into the bore of the eye
(Pic. 8)
. Both bow
parts are now connected with each other.
6. Secure the assembled connecting link
(Pic. 9)
:
• Position the securing pin.
• Knock sleeve pin in with a hammer.
7. Finally check the correct assembly
(see section 4
inspection criteria)
.
3.2 Assembly Instructions
3.2.2 Assembly of chain strands (using connectors)
The chain strands are connected to the balancer using IVS
ICE-Connecting Links.
Sequence of assembly:
1. Install last chain link into the nose
(Pic. 3)
.
NOTE
At the beginning of the bow rounding, the chain link
can be turned 90° within the bow
(Pic.4)
.
2. Position chain strand to the bottom of the bow part
(Pic. 5)
.
3. Assemble the second bow part of the connector into the
balancer plate
(Pic. 6)
.
Pic 3: Install chain into nose of
connector.
ICE-BALANCER
User Instructions - Part 2
Pic 5: Lower bow connected to
chain.
Pic 6: Assembly of the second
bow part.
Pic 9: Securing of connecting pin.
Pic 4: Turn chain link..
Pic 8: Assembly of connecting pin.
Pic 7: Alignment of second bow
part with first bow part.
Содержание Ice 120
Страница 8: ...ICE BALANCER ICE BALANCER...