40
Installing the 7781CM in the Field
Installation Components and Constraints
4
Installing the 7781CM in the Field
Before installing the 7781CM, Ruckus Wireless recommends that you first complete the
procedures described in
“Planning the 7781CM Installation”
the 7781CM at the Depot and Shipping to the Field”
on page 15. Completing these
procedures ensures that the AP installation has been planned, and that the AP has been
prepared for installation.
Continue with the following:
■
Installation Components and Constraints
■
■
Installation Components and Constraints
WARNING:
Only trained and qualified installers should be allowed to install, replace, or
service this equipment.
The professional installer is responsible for the proper installation and configuration of this
AP. The AP installation must comply with local regulatory requirements, especially with
those regulating operation near military and/or weather radar systems.
WARNING:
Installation of this equipment must comply with local and national electrical
codes.
CAUTION:
Make sure that you form a 80mm - 130mm (3”-5”) drip loop in any cable that
is attached to the AP or other equipment. This will prevent water from running along the
cable and entering the AP or other equipment.
CAUTION:
Be sure that grounding is available and that it meets local and national
electrical codes. For additional lightning protection, use lightning rods and lightning
arrestors.
.
CAUTION:
Make sure that proper lightning surge protection precautions are taken
according to local electrical code.
Содержание ZoneFlex series
Страница 2: ......
Страница 6: ...iv ...
Страница 62: ...56 What to Do Next Reading Related Documentation ...
Страница 67: ...61 Appendix B Rebooting and Resetting the 7781CM ...
Страница 68: ...Copyright 2006 2013 Ruckus Wireless Inc 350 West Java Dr Sunnyvale CA 94089 USA www ruckuswireless com ...