VC-410 & VC410POE Ethernet Extender Manual
Chapter 2. Installing the Bridge
2.1 Hardware Installation
This chapter describes how to install the bridge and establishes network connections
and may install the bridge on any level surface (e.g. a table or shelf or rail). However,
please take note of the following minimum site requirements before one begin.
2.2 Pre-installation Requirements
Before you start the actual hardware installation, make sure you can provide the right
operating environment, including power requirements, sufficient physical space, and
proximity to other network devices that are to be connected.
If you experience any error or problem, please be sure, RubyTech will care for you and the
problem. Please contact your local dealer for support. If you are told to send the device
for RMA and repair, ALWAYS ship the whole device with power supplies.
Verify the following installation requirements:
Power requirements:
DC 48V power.
The bridge should be located in a cool dry place, with at least
10cm/4in
of space at the
front and back for ventilation.
Place the bridge away from direct sunlight, heat sources, or areas with a high amount of
electromagnetic interference.
Check if the network cables and connectors needed for installation are available.
Do Not install phone lines strapped together with AC power lines, or telephone office line
with voice signal.
Avoid installing this device with radio amplifying station nearby or transformer station
nearby.
8