RTS SCC Line Скачать руководство пользователя страница 2

- 2 -

4. Guide the upper lever mechanism through
  the opening of the thermocover. 

pic. 4

5. Put the upper transport frame to the trolley
  and fasten it with the combi-nut.
6. Remount the spring of the lever mechanism.
  

pic. 

4

7. Guide the lever through the opening of the 
 thermocover. 

pic. 

5

8. Shorten thermocover to required length 
  (depends on the confi guration of the Combi 
  Duo) at the corresponding seam.
  Make sure the cut is in the center of the 
  selected  seam, to avoid that the seam frays
  

pic. 

6/7

4

5

7

6

Отзывы: