Universal Beltpack
Operation and Maintenance 31
Set Local Power
Local Power is set by shorting pins on the J4 jumper located on the PCBA board. The board must be
removed from the beltpack housing to make this adjustment. For more information on Local power, see
“” on page 15.
To
set local power
, do the following:
1.
Remove the
two side screws
from the beltpack unit.
IMPORTANT:
There are two red o-rings to strengthen the seal and keep moisture out of the beltpack.
Keep these o-rings with the screw. They can sometimes become lodged in one of the
screw holes.
2.
Carefully slide the
top plate assembly from the beltpack enclosure
just far enough to expose
the entire PCBA board. Take care not to disconnect the connectors from the headers.
Содержание BP-4000
Страница 1: ...F 01U 321 601 Rev 02 November 2017 Universal Beltpack Technical Manual BP 4000 BP 5000...
Страница 4: ...4 Universal Beltpack...
Страница 8: ...8 Introduction Universal Beltpack Reference View FIGURE 1 Reference View...
Страница 14: ...14 Introduction Universal Beltpack FIGURE 2 Single Power Supply System...
Страница 15: ...Universal Beltpack Introduction 15 FIGURE 3 Two Power Supply System...
Страница 21: ...Universal Beltpack Initial Setup and Configuration 21 Menu System...
Страница 33: ...Universal Beltpack Operation and Maintenance 33 Notes...
Страница 34: ...34 Operation and Maintenance Universal Beltpack Notes...
Страница 35: ...Universal Beltpack Operation and Maintenance 35 Notes...
Страница 36: ...Bosch Security Systems Inc 12000 Portland Avenue South Burnsville MN 55337 U S A www boschcommunications com...