To complete this section, you will require:
•
The jib
• The jib sheets
•
The top furling unit as attached to the jib halliard
Unroll the jib and connect the tack of the sail direct to
the lower furling unit via the pin and split ring.
a)
b)
Make sure the furling line is uncleated and that the furling unit is fully charged – i.e. all
the furling line is wound round the unit and very little left at the cleat.
5.2 - Hoisting the Jib
c)
Attach the head of the jib to
the top furling unit.
Use tape to cover all clevis rings
Содержание Venture S
Страница 1: ...Rigging Manual V1 PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 24: ...Rigging Guide 5 Sails PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Страница 45: ...Rigging Guide 8 Reefing PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Страница 48: ...Rigging Guide 9 Completion PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Страница 50: ...Rigging Guide 10 Sailing Hints PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Страница 54: ...Rigging Guide 11 Maintenance PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Страница 57: ...Rigging Guide 12 Warranty PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Страница 59: ...a a b c d e b Knot 1 Knot 1 Knot on knot Knot 2 Bowline Knot 4 Knot 2 Knot 5 Knot 3 Knot 6 13 Knots ...
Страница 60: ...a a b b c Knot 3 Figure of eight Knot 4 Overhand knot Knot 6 Cow hitch Knot 5 Double sheet bend 13 Knots ...
Страница 61: ...Rigging Guide 14 Glossary ...