![Royalcraft OXFORD 4 Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/royalcraft/oxford-4/oxford-4_assembly-instructions-manual_1495237002.webp)
R
Assembly Preparation
Before you begin:
Please ch
eck local building cod
es regarding footings, location and other requirements
before beginning construction.
Reviewing all instructions and the appropriate information before you begin, make sure
following the step sequence carefully for successful results.
Safety & Precautions:
Select a suitable level ground that is suitable for the size of your shed at your property.
The owner must use Safety gloves provided when erecting your shed ( 2 pairs are
provided with your shed )
Your shed is supplied in multiple boxes for safe handling
Your shed is DIY shed. Do not attempt to assemble the shed on a windy day.
It is recommended to plan at least one whole day for the assembly of your shed by 2
persons.
A suitable ladder will be required to assemble your shed - we recommend you take
necessary precautions to avoid injury.
Be cautious with the tools used for the assembly of the shed .Familiarize yourself with
the operation of all the power tools.
For floor covering, the owner can purchase flooring material locally. We have supplied
the foundation kit with the shed which can be used as floor base. Instructions about how
to assemble foundation kit and how to fix flooring to the foundation kit are included in the
manual.
Location and Base:
A good location for the storage building is a square and level area with good drainage.
The base is not included in the kit which may need purchase separately or may construct a
foundation and anchoring system of your own. The recommended base size about 10 cm
larger than the bottom rail of the shed.
A strong plastic sheet (thickness: at least 150μm) should be placed under the foundation to
assist in reducing rising dampness from the soil, thus reducing condensation build up in the
shed.
Your storage building
must be anchored
to prevent wind damage. Once secured, it is highly
recommended applying silicone along the inside of the base rail to minimize condensation.
www.royalcraft.co.uk
OXFORD 4
2 / 31
Содержание OXFORD 4
Страница 1: ......
Страница 4: ...R Size Area of installation requirement www royalcraft co uk OXFORD 4 4 31 ...
Страница 5: ...www royalcraft co uk OXFORD 4 5 31 R ...
Страница 6: ...R www royalcraft co uk OXFORD 4 6 31 ...
Страница 7: ...R www royalcraft co uk OXFORD 4 7 31 ...
Страница 8: ...R www royalcraft co uk OXFORD 4 8 31 ...
Страница 9: ...R www royalcraft co uk OXFORD 4 9 31 ...
Страница 10: ...R www royalcraft co uk OXFORD 4 10 31 ...
Страница 11: ...R www royalcraft co uk OXFORD 4 11 31 ...
Страница 12: ...R www royalcraft co uk OXFORD 4 12 31 ...
Страница 13: ...R www royalcraft co uk OXFORD 4 13 31 ...
Страница 14: ...R www royalcraft co uk OXFORD 4 14 31 ...
Страница 15: ...R www royalcraft co uk OXFORD 4 15 31 ...
Страница 16: ...R www royalcraft co uk OXFORD 4 16 31 ...
Страница 17: ...R www royalcraft co uk OXFORD 4 17 31 ...
Страница 18: ...R www royalcraft co uk OXFORD 4 18 31 ...
Страница 19: ...R www royalcraft co uk OXFORD 4 19 31 ...
Страница 20: ...R www royalcraft co uk OXFORD 4 20 31 ...
Страница 21: ...R www royalcraft co uk OXFORD 4 21 31 ...
Страница 22: ...R www royalcraft co uk OXFORD 4 22 31 ...
Страница 23: ...R www royalcraft co uk OXFORD 4 23 31 ...
Страница 24: ...R www royalcraft co uk OXFORD 4 24 31 ...
Страница 25: ...R www royalcraft co uk OXFORD 4 25 31 ...
Страница 26: ...R www royalcraft co uk OXFORD 4 26 31 ...
Страница 27: ...R www royalcraft co uk OXFORD 4 27 31 ...
Страница 29: ...R www royalcraft co uk OXFORD 4 29 31 ...
Страница 31: ...R 3 Fasten Plywood to foundation kit frames with self drilling screws www royalcraft co uk OXFORD 4 31 31 ...