Royal Sovereign RBW-1500 Скачать руководство пользователя страница 10

10

Welding line

6. OPERATION

The Banner Welder must only be used by trained and qualified personnel.
The Banner Welder must be used only for welding material for which it has been designed.
For recommended maximum welding thickness see page 15.

Welding:

NOTE:  When you feed the banner into the machine, you should guide the banner by the hand or by  

 Banner Guide to keep it move in a straight line.

1.  The Banner Welder should be positioned on a level surface in an area with adequate lighting and enough work space

for feeding materials. Connect the power cord to the AC outlet and turn the Power Switch to the on position. Depress 
the power button on the control panel. The machine should  
only be operated from the front (control side) of the machine.

2. Before welding, first determine the folded area to be welded, adjust 

the guide plate and set it to the proper position. Set the temperature 
and speed referencing the Recommended Temperature and Speed  
section. (Note: Due to varying manufacturing processes of banner  
material fine tuning may be required).

3. Fold over material to allow for a minimum of 1/2" weld.
4. The point of the arrow is the middle of the weld. Align the outer edge 

of the fold over to the inner edge of the  arrow.(Fig. 6-1)

5. Guide the banner into machine. The drive belts will grab banner and 

pull the banner through machine.(Fig. 6-2)

6. Welded banner will exit machine.
7. Test the weld for tight seal.
8. For best results rotate the banner 90° in a clock wise direction. 

Fold over the short side and guide the banner into the machine 
with the 4 layer fold entering last. (Note: Turn the speed down 1 to 2 
positions to compensate for the extra layers of material).

Fig. 6-1

Fig. 6-2

MyBinding.com

5500 NE Moore Court 

Hillsboro, OR 97124 

Toll Free: 1-800-944-4573 

Local: 503-640-5920

Содержание RBW-1500

Страница 1: ...Manual Please read and retain these instructions To register your product please go to www royalsovereign com USA Click the Customer Support Tab then Registration Tab MyBinding com 5500 NE Moore Cour...

Страница 2: ...6 4 1 Electrical requirements 6 4 2 Box contents 6 4 3 Assembly 8 5 Control Panel 9 6 OPERATION 10 7 MAINTENANCE 11 8 TROUBLESHOOTING 14 9 SPECIFICATION 15 10 RECOMMENDED SETTING 15 11 WARRANTY 16 MyB...

Страница 3: ...for the Banner Welder 2 Ensure the unit is plugged into a properly grounded outlet with the correct voltage 3 During operation keep hands away from heating blocks and avoid inserting foreign objects i...

Страница 4: ...ly complying with the procedures of this manual and using the personal protection devices indicated such as Carefully positioning the power cord so that it cannot be stepped on or damaged Maintenance...

Страница 5: ...n Switch 2 Feed Table 9 Adjustable Stand 3 Top Cover 10 Support Bar 4 Speed Knob 11 Base 5 Body 12 Caster 6 Emergency Switch 13 Leveling Legs 7 Rear Cover 1 8 4 5 6 3 2 7 9 10 11 12 13 MyBinding com 5...

Страница 6: ...censed electrician ensures proper power installation to your Banner Welder in accordance with electrical codes in your area 4 2 Box contents Thoroughly inspect the parts and the unit It is imperative...

Страница 7: ...opper inside 4 Tool box 5 16 Hexa Head Bolt Screw M8 80 Star Washer 8 2 3 3 Knob Bolt Guide 2 5 16 Hexa Head Bolt Screw M8 30 Spring Washer 8 2 4 4 Welding Belt 4 Wood Screw Washer Plain 6 6 Fuse AC25...

Страница 8: ...the Banner Welder body on the adjustable stand and secure it with the supplied screws M8x30 Adjusting the leveling legs to keep it level and solid Fig 4 4 7 Attach the guide plate to the feed table us...

Страница 9: ...use the up arrow to increase temperature or the down arrow to decrease temperature 3 ST BY To switch to stand by mode temperature will be automatically set to 176 F press the ST BY button If the mach...

Страница 10: ...d area to be welded adjust the guide plate and set it to the proper position Set the temperature and speed referencing the Recommended Temperature and Speed section Note Due to varying manufacturing p...

Страница 11: ...ular weld side Rope Pockets 1 Weld banner the same as with pole pockets only making a smaller rope pocket 2 Insert an electrician s fish tape through pocket and hook on end of rope using a large paper...

Страница 12: ...ner to remove residual adhesive from the belts DON T TRY TO REPLACE BELTS WHEN MACHINE IS HOT Unplug the unit and allow it to sufficiently cool 1 Remove the top board covers Unscrew the Philips head s...

Страница 13: ...ooling block Fig 7 3 4 Replace the worn out belts with new belts 5 Loosen the adjustment screw If the banner is too thick please tight the adjustment screw 6 Replace the drive belt and three wheels Fi...

Страница 14: ...e a Put the power switch to the on position b Replace the fuse The display show E0 The emergency switch is in on position Put the switch in off position The display show E1 a The wire of the upper sen...

Страница 15: ...Welding Speed 16 ft min 0 5m min Max Heating Temperature 662 F 350 C Adjustable stand 29 42 735 1055mm Cooling Method Fan Digital Display LED Unit Dimensions 24 x 15 x 9 600 x 366 x 216 mm Unit Dimen...

Страница 16: ...st be filed through Royal Sovereign or the authorized Royal Sovereign dealer or reseller through which the equipment was originally purchased Model serial number and date of delivery are required for...

Отзывы: